My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Mitigation Unit for review. For further at contact he Site Mitigation Unit at (209) <br /> 468-3450. <br /> 2. PI AN R MIT FEES <br /> a. New facility plan review fee of $712.00 (8 hour minimum per facility), $500.00 facility <br /> fee (includes one tank), $125.00 per tank after the first tank, plus $10.00 state <br /> surcharge fee per tank is due at time of plan submittal plus $17.50 per site state <br /> surcharge. <br /> b. New installation of an additional tank at an existing facility is $712.00 plan review fee (8 <br /> hour minimum per facility) plus $500.00 facility (includes one tank), $125.00 per new <br /> tank after first tank, and $10.00 per new tank state surcharge fee. <br /> C. It should be noted that a $712.00 plan review check fee required for each submittal <br /> allows for up to eight (8) hours of staff review and/or inspection time. Additional time <br /> spent on plan review, meetings, inspections, phone or office consultations will be billed <br /> to the applicant at a rate of $89.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the EHD within 20 working days of submittal date to identify <br /> any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with a checklist identifying <br /> plan deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may <br /> be submitted to have review completed within 10 working days of submittal date if staff <br /> is available to perform the review. <br /> 3. PI AN R VE_ IEW CLID LINES <br /> a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br /> drawings to EHD. <br /> b. A copy of the California UST Regulations may be obtained from the California State <br /> Water Resources Control Board at (916) 227-4303. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Valley <br /> Unified Air Pollution Control District, the County/City Building Department and the Fire <br /> District in your respective area. <br /> d. A minimum of 3 inspections will be conducted on the UST system installation. An $89 <br /> per hour inspection fee shall be charged for additional inspections or reinspection as <br /> required. (See required inspections below) <br /> e. Applicant/contractor to adhere to the approval plan and any change or deviation shall <br /> be reported to and approved by EHD prior to installation. <br /> f. The application for installation of underground tanks is only valid for the calendar year <br /> in which it has been issued. A permit may be extended into the next calendar year if a <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.