My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 9:11:06 AM
Creation date
10/9/2018 2:10:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003025
FileName_PostFix
XR0003025
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert Cochran <br />Chevron Environmental Management Company -2- <br />12 August 2003 <br />shut down the SVE system, due to asymptotic levels of treated <br />SVE system shutdown, contaminants and lack of rebound after <br />2) I recommend that Chevron conduct computer modeling of the remaining <br />groundwater, to determine the pumping rate necessaryto maintain h <br />City of Lodi Municipal Well #! 2 Wel] 412 contaminant mass in soil and <br />� hydraulic control and protect <br />should consider various pumping rates (including O no southwest <br />twest of extraction well EX -2. The modeling <br />modeling show no impact to Well #12, then the GWE system may also be shut down.Pumping) If soil <br />3) Groundwater monitoring will continue after GWE system shutdown, to determine <br />During the GWE rebound test, all monitoring wells will be sampled quarterly cycle (one year). If little or no rebound occurs, then Chevron or at l asst one <br />occurs. <br />9 y for at least one hydrologic <br />may submit a site closure report. <br />4) Quarterly groundwater monitoring is required by Regional Board Cleanup <br />No. 5-00-704. After the soil/groundwater modeling and GWE system reboud to Abatement Order <br />been conducted and the report(s) have been reviewed by Regional Board staff, test (Comment 2) have <br />reconsidering Chevron's request to reduce groundwater monitoring, or consider a r °mmend <br />Action Required at the site. <br />equest far No Further <br />5) The California Registered Geologist listed on the signature page did not signt <br />by the California Business and professions Code. Submittal of a revised signature <br />California licensed professional engineer or geologist with'license he Report, as required <br />cense number/seal is necessary. by a <br />
The URL can be used to link to this page
Your browser does not support the video tag.