Laserfiche WebLink
l� <br />Chevron Products Company 3 <br />Former Chevron 9-5775, 301 West Ke"Ieman Cane, Codi, CA November 16, 2004 <br />• WESTEX failed to arrive at the site on November 1, 2000. A call was placed to <br />WESTEX and SECOR was informed that the driller had called -in sick. No <br />other drillers were available or could be made available to operate the drilling rig <br />for two days. Drilling did not resume until November 3, 2000. <br />• On November 3, 2000, groundwater extraction well EX -3 was completed. <br />Please note that aquifer testing is currently being performed at the site. In accordance <br />with our conversation on November 9th, SECOR has temporarily shut down the <br />remediation system to allow groundwater levels to return to naturally occuring levels. <br />This shut down has been performed to allow meaningful data to be collected during the <br />aquifer test. The system will be restarted upon the completion of the testing during the <br />week of November 20, 2000. <br />077.41991.04$/9-5775extension req <br />