Laserfiche WebLink
10/00/00 FRI 12:14 FAX 18055460583 SECOR-SAN LUIS OBISPO Q011 <br />ISO-GEW <br />To Install the ISO -GEN pump and cell, first the connecting wires mist be installed from the junction <br />box to the well head. A mmunum of 4 conductors are required to make each system fxmcdon. 2 <br />conductors will carry the DC current to each LSO -GEN Cell, 2 conductors will supply each pump with <br />12 VDC. <br />Installation Procedures: <br />WARNING — VERIFY POWER ILS DISCONNECTED TO CONTROL PANEL <br />• It is recommended that the ISO -GEN System utilize a dedicated breaker with no other <br />devices attached. <br />• Estimate the length ofrun wire required to install the ISO -GEN _ The Iength is the toW <br />distance to run the wires from the Control Panel to the well head. Install wires <br />according to the site electrical code. <br />• Attach pump wires -to the terminal bar inside the Control Panel. <br />• Attach cell wires to the ter�mind bar inside the Control Panel <br />• Seal hole that penetrates the well head skirt(s) using silicone sealant. <br />• Drop cell and pump assembly down well urs it hits bottom. Lift system a minimum of <br />18 inches from the bottom. Repeat for each well treated <br />• Thread cell and pump wares through the Gas Absorption Cap and lock the strain relief <br />around the wares in the appropriate position. <br />• Attach cell and pump wires at the well head(s) uffizing the supplied waterproof <br />connectors. <br />Double check all connections! <br />n <br />u <br />