My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003043
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:56:44 AM
Creation date
10/9/2018 4:27:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003043
FileName_PostFix
XR0003043
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/00/00 FRI 12:14 FAX 18055460583 SECOR-SAN LUIS OBISPO Q011 <br />ISO-GEW <br />To Install the ISO -GEN pump and cell, first the connecting wires mist be installed from the junction <br />box to the well head. A mmunum of 4 conductors are required to make each system fxmcdon. 2 <br />conductors will carry the DC current to each LSO -GEN Cell, 2 conductors will supply each pump with <br />12 VDC. <br />Installation Procedures: <br />WARNING — VERIFY POWER ILS DISCONNECTED TO CONTROL PANEL <br />• It is recommended that the ISO -GEN System utilize a dedicated breaker with no other <br />devices attached. <br />• Estimate the length ofrun wire required to install the ISO -GEN _ The Iength is the toW <br />distance to run the wires from the Control Panel to the well head. Install wires <br />according to the site electrical code. <br />• Attach pump wires -to the terminal bar inside the Control Panel. <br />• Attach cell wires to the ter�mind bar inside the Control Panel <br />• Seal hole that penetrates the well head skirt(s) using silicone sealant. <br />• Drop cell and pump assembly down well urs it hits bottom. Lift system a minimum of <br />18 inches from the bottom. Repeat for each well treated <br />• Thread cell and pump wares through the Gas Absorption Cap and lock the strain relief <br />around the wares in the appropriate position. <br />• Attach cell and pump wires at the well head(s) uffizing the supplied waterproof <br />connectors. <br />Double check all connections! <br />n <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.