Chevron ProducLR Company 7 <br />. Chevron Station tl9-5775 '101 W Kettleman Line Lodi ( A At)ku%t 25 2000 <br />Groundwater Extraction Capture Zone Evaluation <br />Operation of the interim GWE system consisting of one extraction well (EX -1) was <br />initiated on July 3, 2000 On August 7, 2000, SECOR measured water levels at the site <br />to evaluate the capture zone of well EX -1 Based upon the water level data collected, <br />the current pumping rate of EX -1 (less than 0 3 gpin), and that wells MW -1 and MW -4 <br />were not accessible due to ongoing site construction, an exact capture zone was not able <br />to be determined Due to the relatively low extraction rate associated with the soil types <br />underlying the site, further capture zone evaluation will be based on data collected over a <br />longer period of time, and from additional monitoring wells upon completion of <br />construction activities at the site Well EX -1 should be redeveloped prior to such <br />testing <br />Additionally, capture zone evaluation could also be performed on additional extraction <br />wells However, this testing was not conducted at this time due to the iequest of Mr <br />Marty Hartzell of the RWQCB in a conversation with Mr Roger Hoffinore of SECOR <br />in June of 2000 (Attachment D) Mr Hartzell stated that pumping from wells other than <br />EX -1 was not approved at this time as such pumping might result in the expansion of the <br />existing plume Mr Hartzell agreed that if frill -time purnprrig from well EX -1 <br />(commenced on July 3, 2000) did not demonstrate control of the plume, pumping from <br />other wells, particularly in the direction of the municipal well, would likely become <br />necessary <br />REMEDIAL OBJECTIVE AND RECOMMENDED REMEDIAL <br />ALTERNATIVE <br />The objective of remediation at this site is to protect existing and potential uses of <br />groundwater Existing uses of relevance to the ai ea include, but ai e not limited to, <br />municipal and drinking water supply Interim remediation has been initiated at the site, <br />as described in G -R's Site Update fbi Foiniel Chew on Station 9.5775, dated July 14, <br />2000 Based upon the remedial objective and interim remedial work performed to date, <br />SECOR proposes the following <br />Soil Vapor Extraction <br />The interim SVE system operating at the site consists of four SVE wells and a 100-cfm <br />catalytic oxidizer Based upon the data collected by G -R, the interim SVE system <br />operating at the site has a sufficient radius of influence to remediate hydrocarbon <br />impacted soil Figure 16 shows the estimated radius of influence for the SVE system <br />using G -R's 60 -foot radius of influence that was derived from their SVE feasibility test <br />Therefore, SECOR recommends continued operation of the SVE system to address the <br />• secondary source on hydrocarbons in soil SVE data will be collected and evaluated on a <br />bi-monthly basis to verify currently understood influence of the existing wells If <br />ongoing evaluation of this O&M data suggests that the area of influence does not fully <br />077 41991 043/FRP <br />