My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003063
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:20:41 AM
Creation date
10/10/2018 8:37:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003063
FileName_PostFix
XR0003063
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />0 <br />Date October 13, 2000 <br />CHEVRON QUARTERLY PROGRESS REPORT (3Q2000) <br />Primary Agency Marty Hartzell <br />RWQCB-CVR <br />3443 Routner Road, Suite A <br />Sacramento, CA 95827-3098 <br />Facility No 9-5775 Address <br />CHEVRON Project Manager <br />Consulting Co /Contact Person <br />Consultant Project No <br />Assembly Bill 681 Status <br />SECOR <br />h1lemalional hlcolporalecl <br />301 West Kettleman Lane, Lodi, California <br />Robert Cochran _ <br />SECOR International, Inc — Roger Hoffmore <br />077 41991 043 <br />Property Owners Ivern and Roger Baffom _ <br />WORK PERFORMED THIS QUARTER: Third Quarter — 2000. <br />1 Conducted quarterly groundwater monitoring and sampling <br />2 Prepared and submitted quarterly groundwater monitoring and remedial system evaluation report <br />3 Operation and maintenance of groundwater extraction 1 soil vapor extraction system <br />4 Completed installation of 10 monitoring wells <br />5 Prepared and submitted Problem Assessment Report (PAR) <br />6 Prepared and submitted Final Remediation Plan (FRP) <br />WORK PROPOSED FOR NEXT QUARTER: Fourth Quarter - 2000- <br />1 Prepare and submit quarterly groundwater monitoring and remedial system evaluation report <br />2 Conduct quarterly groundwater monitoring and sampling <br />3 Operation and maintenance of groundwater extraction I soil vapor extraction system <br />4 Prepare and submit Work Plan <br />5 Prepare and submit addendum to PAR/FRP <br />6 Conduct a capture zone evaluation for extraction wells MW-14/EX-1 and EX -1 <br />10.1v16 81 VAN <br />J <br />}tii iv�t'` <br />3017 ArIgwe Road 1mly 100 Noicho rotdoia l 1 95670 916861 0400 910 861 0450 Fai tarn +ecus corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.