Laserfiche WebLink
SAN$1QAQUIN <br />COUNT`r' <br />Environmental Health Department <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />ESCALON UNIFIED SCHOOL DIST <br />1176 STANISLAUS ST, ESCALON <br />July 16, 2018 <br />Other Violations <br />4040 <br />See below <br />Unlisted Release/Leaks/Spills violation <br />❑ V ❑ R ❑ COS <br />4050 <br />See below <br />Unlisted Abandonment/Illegal Disposal/Unauthorized Treatment violation <br />❑ V ❑ R ❑ COS <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />203 <br />CFR 112.3 Failure to implement the SPCC Plan. <br />The SPCC plan states that Appendix E of the plan will be posted next to loading areas. Appendix E, describing <br />unloading/loading procedures was not seen posted near the loading/unloading areas. The SPCC plan calls for spill <br />kits to be placed near the dispensers, spill kits were not observed near the dispensers. The owner or operator or an <br />onshore or offshore facility subject to this section must prepare in writing and implement a Spill Prevention Control <br />and Countermeasure Plan (hereafter "SPCC Plan" or "Plan")," in accordance with § 112.7 and any other applicable <br />section of this part. Implement the SPCC plan as written or amend the plan to reflect actual facility procedures. <br />This is a minor violation. <br />301 <br />CFR 112.5(a) Failed to amend Plan as necessary. <br />The 500 gallon used oil aboveground storage tank described as being in the diked area next to the 10,000 gallon <br />diesel tank is no longer at the site and a square blue used oil tank outside of the diked area, near the oil water <br />separator is not mentioned in the SPCC plan. The Spill Prevention, Control, and Countermeasure (SPCC) Plan <br />must be amended when there is a change in the facility design, construction, operation, or maintenance that <br />materially affects its potential for a discharge, within 6 months of the change, and implemented as soon as possible, <br />not later than 6 months following preparation of the amendment. Immediately make all necessary amendments to <br />the SPCC Plan to accurately represent the procedures and policies currently in place at the facility. <br />This is a minor violation. <br />302 <br />CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan was last reviewed on April 9, 2011 . A review and <br />evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this review and <br />evaluation, the SPCC Plan must be amended within 6 months of review, and recertified by a Professional Engineer <br />if any technical amendments were made. Immediately conduct a review of the facility SPCC Plan and make any <br />necessary amendments. <br />This is a Class II violation. <br />601 <br />CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan does not follow the order or requirements in 40 <br />CFR Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 CFR 112 <br />for the Plan, you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br />requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan to include a <br />cross-reference or to follow the required sequence. <br />This is a minor violation. <br />EHD 28-01 Rev. 11/07/2017 <br />Page 4 of 8 <br />FA0003822 PR0528253 SCO01 07/16/2018 <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 <br />Aboveground Petroleum Storage Act 01 <br />www.sjcehd.com <br />