Laserfiche WebLink
LIC <br />FEB 2 5 Z016 <br />7LIT N _ IT i L; NN <br />E&I EN <br />V D T C, [ki, DAN a 7 ZHUN <br />ELF CTIRICAL CONT13,04 P41*1, <br />Breakers/Switches - Ensure s'AIIChes are In the proper position, are not tripped and there are no obvious signs <br />of tampering or damage <br />Decals and Tags - Ensure aft bmakers1switches are properly and Beady Identified <br />In d1cator Lights - Ensure all lights are working correctly and are clearly identified <br />SYSYEM <br />Server Cabinet - Ensure there are no red warning indicators on the front of the servers status panel or the Direct <br />Connect satellite box <br />PLC Cabinet -Ensure there are no red oryellow Indicators on the front ofthe PLC <br />OWS Graphics - Ensure them are no red alarms [n the Alarm Bar located on the bottom of the UCOS Runtime <br />graphics <br />VENTER—_ <br />Ny�q <br />acor Locks - Ensure doors are locked and there are no -signs of unauthorized entry. <br />✓ <br />Enunciator Lights/Panel - Ensure correct lights are onloff. Press 'IeWbuffon, it equipped, to make sure all <br />lights work correctly <br />Water Leaks -Look for signs of water leaking Into MCC <br />HVAC - Ensure the heating and cooling system Is working properly <br />Labeling - Ensure 0equipment, switches end breakers am labeled property for clear Iden6ficadon <br />AIRCOMPRESSOR$ <br />Water Drains - _9p, -n to remove anrwaterand then dose <br />Belts - Ensure the belts are not too tight ortoo loose. Lookfarsigns of wear <br />Gauges - Ensure they work correctly. Ensure compressor comes oftff at correct setpoints <br />be <br />- <br />Ll <br />-✓7 <br />7, <br />0 i I Levels - Check oiler or sight g;a ss for level and condition of oil <br />k, <br />Abnormal NoI%e - Us teri for squealing belts, grinding bearings and other noises that aren't normal and could be <br />a sign of impending failure <br />Vibration - L oo Misten for excessive vibrations that indicate impending failure <br />On -of Switch -Ensum switch operates correctly <br />V <br />Air Leak - Listen forleaks <br />Valves - Ensure all valves are in their correct opera Yng position <br />Awl <br />T7 <br />DAILY- V s ua !,y Inspect to ensure there are ro vapor or liquid leaks <br />product STAGE I Check for and vaporleaks Inspect liquid level to paver.! <br />sure pump works comecityand there are no signs ofconlaminatIon <br />STAGE 2 Check for product and vapor leaks. Inspect liquid level to prevent overflowing Make <br />sum pump works correctly and there are no signs of contamination. <br />3 Check for product and vapor leaks Inspect liquid level to prevent over1cwing Make <br />pump works correctly and there are no signs ofcontaminabon <br />WAM.A "U)VVNPk*wJ0j Refer <br />Drums - How many drums ere on silo? Check forspills, leaks and signs of damage. Ensure drums are stored <br />vwthin guidelines and are dated, arrange to have drums removed that are approaching their storage deadline <br />Drum Labeling - Ensure alf drums are labeled property within guidelines, with accumulation start date, and that <br />date is less than 90 days old, ensure drum 1-d is secured <br />t <br />4VIARDOM <br />Housekeeping - Leaks or spills, keep dean and orderly, ensure only appropriately labeled waste Is stored there <br />