Laserfiche WebLink
D.Results of Testing/Servicing RECEIVED <br /> Software Version Installed: 327.04 <br /> DEC p 5 2014 <br /> Complete the following checklist: <br /> • Yes No* Is the audible alarm operational? 13 TA <br /> • Yes No* Is the visual alarm operational? T <br /> • Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> + Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir proper operation? <br /> • Yes r No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> Yes No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> • N/A all that apply)r Sump/Trench Sensors; r Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?r Yes; r No <br /> • Yes r No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> • N/A 3o,at what percent of tank capacity does the alarm trigger? <br /> • Yes* • No Nas any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> • Yes* • No Las liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product; r Water.If yes,describe causes in Section E below. <br /> • Yes No* as monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Yes No* Ils all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> Monitoring System Certification Page 2 of 3 12/07 <br />