My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PETERSEN
>
3663
>
2800 - Aboveground Petroleum Storage Program
>
PR0517463
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:41:08 AM
Creation date
10/10/2018 4:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517463
PE
2832
FACILITY_ID
FA0010627
FACILITY_NAME
Penske Truck Leasing Co., LP
STREET_NUMBER
3663
STREET_NAME
PETERSEN
STREET_TYPE
Rd
City
Stockton
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
3663 Petersen Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or Auipm ent is installed. <br /> This section must be completed if in tank gauging equipment is used to perform leak detection monitoring. <br /> ECaVED <br /> Complete the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? ()52014 <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> • Yes r No* Was accuracy of system product level readings tested? NTLTH <br /> • Yes No* as accuracy of system water level readings tested? ART r7 <br /> Yes ri No* ere all probes reinstalled properly? <br /> Yes r No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check a#that <br /> N/A apply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; I 0.2 g.p.h. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes r No* Was the testing apparatus properly calibrated? <br /> Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r N/A <br /> • Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system is disabled or disconnected? <br /> • Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system malfunctions or fails a test? <br /> Yesr No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes No* 1were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> I didn't test leak detectors. <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.