My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
2323
>
2800 - Aboveground Petroleum Storage Program
>
PR0528393
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 4:47:28 PM
Creation date
10/10/2018 4:36:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528393
PE
2832
FACILITY_ID
FA0009156
FACILITY_NAME
CALAMCO
STREET_NUMBER
2323
Direction
W
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
01
SITE_LOCATION
2323 W PORT RD G
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, q ,r=ME- <br /> CFR 112.7(a){3}Plan failed to address facility layout,operations discharge prevention <br /> n se e a methods and containers.The SPCC Plan did not discuss discharge prevention measures <br /> Vk�� s <br /> . ��' 'fix••Snd discharge or drainage controls for the generators and compressors at the facility. <br /> The descriptions of secondary containment structures for the other tanks on site did <br /> :. <br /> P� :; r.• G SSR;..Yt - z not include the size of the containments or any indication that they were adequately <br /> z: ized.The following steal!be addressed in the Spill Prevention,Control,and <br /> s c�q ar•` <br /> "4: 9 Countermeasure(SPCC)Plan: <br /> <, <br /> type of oil in each fixed container and it's storage capacity.For mobile or potable <br /> 'srr• .�-;'��i'•�•'�'�.r >�<.+: containers,the type of oil and storage capacity for each container or an estimate of the <br /> potential number of mobile or portable containers,the types of oil,and anticipated <br /> orage capacities <br /> V. discharge prevention measures Including proceduresfor routine handling of products <br /> discharge or drainage controls such as secondary containment,equipment and <br /> tMQ.r� , procedures for the control of a discharge <br /> •, ;t � �, countermeasures for discharge discovery,response,and cleanup <br /> t' M�..: <br /> s part of the SPCC Plan,there is a map which depicts methods of disposal of recovered materials <br /> w + 9 <br /> � �,,,��+ „;, �•-r,�.,�����s�r the locations of elements necessary to meet the invent contact fist and phone numbers for the facility response coordinator,Nationsl <br /> of this standard. In addition,section 2.0(Potential Response Center,cleanup contractors,and all appropriate Federal,State,and local <br /> Spill Sources&SPCC Features}in CAI.AMCO's SPCC agencies.Immediately amend the SPCC Plan to include all required information. <br /> Plan has been modified to include the elements his is a Class[I violation. <br /> � �`- discussed in the deficiency noted. <br /> M a }7� kss r fir., LF K 112 7j cl Fai led to proVicle mconcia ry co rita I nment,a eve Mionary struMPTs,or <br /> equipment to prevent discharge.Secondary containment was not provided for two of <br /> _•.; � ?.::� �c� he compressors and one of the generators.A facility shaft provide appropriate <br /> containment and/or diversionary structures or equipment to prevent a discharge_The <br /> For this deficiency noted,the generator in question entire containment system,including walls and floor,must be capable of containing oil <br /> =�..,�,f,'•�"+x� x ,rte F <br /> does not have storage of substances that would nd must be constructed so that any discharge from a primary containment system will <br /> r'y second 'i <br /> require re s containment 'ae generator has not escape the containment system before cleanup occurs_ <br /> q <br /> a?g ;'M1r „rF fixed piping as a supply for operation. Immediately provide adequate secondary containment for all aboveground petroleum <br />
The URL can be used to link to this page
Your browser does not support the video tag.