Laserfiche WebLink
AURA <br /> x � kiok <br /> 7 ` �r R 112.7(e)Failed to conduct inspections or maintain records for 3 years_ <br /> k ,,fti �^ stia The inspection forms being used are not the forms provided by Spill Prevention, <br /> Control,and Countermeasure <br /> Fi � ,,� •,r�` hr �. e;. (SPCC)Plan,and in some instances,do not contain the same information.Inspections <br /> t-tt :Y.rp;:.„.. and tests must be conducted and stored in accordance with the written procedures <br /> nen? �' developed for this facility in the SPCC Pian.Immediately begin conductingall <br /> � 'nspections and tests in accordance with the procedures in the SPCC Plan,oramend <br /> xat <br /> � xswsfi� he Pian and have it recertified by a Professional Engineer to accurately reflect the <br /> inspection procedures currently followed at the facility. <br /> rhe monthly inspections do not include the generator,drums,and compressors. <br /> nspections and testing shall be conducted on all aboveground liquid petroleum <br /> y rs jr , 7ontainers 55 gallons and larger,including the two generators,four compressors,the <br /> 50 gallon used oil tank,and all 55 gallon drums of oil.Records of these inspections <br /> �,a:•�; ,,. � �t^�:'t: .;ryas”: <br /> {LSI', , ,... ,r,.• i..�rr.. <br /> PCC Plan has been updated and new form accounts nd tests shall be signed by the appropriate supervisor or inspector and kept on site <br /> for all necessary elements required for inspection. ith the Spill Prevention,Control,and <br /> I.T. „'Ri y,3"�'''LZ:` y.Y,,• ry tI <br /> Included is a copy of the old form which was in use ountermeasure(SPCC)Plan for a period of three years.immediately begin necessary <br /> (depicting intent of CALAMCO to monitor and inspect :esting and inspections for all Aboveground Petroleum Storage Act regulated <br /> i V •. x b t <br /> on a monthly basis),a copy of a 2 hour plant reading orrtainers and maintain on site with the SPCC Plan. <br /> inspection(which includes inspections for leaks). <br /> , v "ate ty; CFR 112.7(f)(1)Failed to train personnel on discharge prevention. <br /> lm,, to ii handling personnel were not trained.At a minimum,oil handling personnel shall be <br /> trained in the operation and maintenance of equipment to prevent discharges; <br /> � ischarge procedure protocols;applicable pollution control laws,rules,and <br /> i sP° raining records attached show training on spill egulations;general Facility operations;and the contents of the Spit!Prevention, <br /> countermeasures. Moving forward,training will be Control,and <br /> fyr+s ` .r.�s4 2 Viz; ` provided to address elements of the SPCC Plan, Countermeasure Plan.Immediately provide this training to all oil handling personnel <br /> Discharge Prevention(Attached is a copy of the and submit a copy of the training log to the EHD. <br /> updated training agenda). Also attached is updated This is a Class If violation. <br /> training forspecific individuals who handle oil. <br /> CFR 112.7(f)(3)Failed to schedule and conduct discharge prevention briefings at least <br /> � r� x <br /> Discharge prevention briefings are not scheduled at least once a year.Discharge <br /> prevention briefings for oil handling personnel must be scheduled and conducted at <br /> east once a year to assure adequate understanding of the SPCC Pian for that facility. <br /> In addition to the Discharge Prevention Training for Such briefings must highlight and describe known discharges or failures,malfunctionin <br /> Oil Handling Personnel,Discharge Briefings will be components,and any recently developed precautionary measures.Immediately <br /> r c� <br /> �'�`- --'' ;�•r$�;F �n��,-rincluded/part of the discussion and documented via schedule and conduct a discharge prevention briefing,,ensure that they are scheduled <br /> ;y �.,t,* •_ :.. , !� f <br /> sign in sheet,at a minimum once per year. Please see nd conducted at least once a year. <br /> g P Y Y <br /> ;:° attached training records. <br />