Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Web:www.sigov.org/ehd <br /> CONTINUATION FORM Page: 4 of 7 <br /> OFFICIAL INSPECTION REPORT Date: 08/20/12 <br /> Facility Address: 833 E. Eighth St., Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I, CLASS II,or MINOR-Notice to Comply) <br /> Notice to Comply - Minor violations: (104, 201, 303, 501, 504, 505, 507, 510, 513, 514, 517, 518, 519, <br /> 609, 611) <br /> 104. The 2012 annual permit fees for this facility have not been paid. Each year each owner or operator <br /> of a tank facility who is subject to the requirements of APSA shall pay an annual fee to the CUPA. <br /> Immediately contact the San Joaquin County Environmental Health Department (EHD) to arrange for <br /> payment of the past due amount. <br /> 201. The Professional Engineer (PE) certification is incomplete. The certification did not include <br /> statements regarding visiting the facility, consideration of applicable industry standards, procedures for <br /> inspections and testing, or the adequacy of the Plan. The PE certification must include all of the aspects <br /> in 40 CFR Part 112.3(d)(1), including attesting that the PE is familiar with 40 CFR 112, he or his agent <br /> has visited and examined the facility, the Plan has been prepared in accordance with good engineering <br /> practice, including consideration of applicable industry standards, procedures have been established for <br /> required inspections and testing, and the Plan is adequate for the facility. Immediately obtain a <br /> complete PE certification for the facility's Spill Prevention Control and Countermeasure (SPCC) plan. <br /> Submit a copy of the completed, certified SPCC plan to the EHD by September 22, 2012. <br /> 303. The SPCC Plan has a revised date of March 2009. No review log was available. You must <br /> document your completion of the review and evaluation, and must sign a statement as to whether you <br /> will amend the Plan, either at the beginning or end of the Plan, or in a log or appendix to the Plan. The <br /> following words will suffice: <br /> "I have completed the review and evaluation of the SPCC Plan for (name of facility) on (date), and will <br /> (will not) amend the Plan as a result." <br /> Immediately amend the SPCC Plan to include all necessary documentation of the Plan reviews and <br /> ensure that future Plan reviews are properly documented. <br /> 501. The SPCC Plan does not follow the order or requirements in 40 CFR Part 112. The "cross- <br /> reference" provided compared "old" versus "new" code sections, but did not include page sections. If <br /> you do not follow the sequence specified in 40 CFR 112 for the Plan, you must prepare an equivalent <br /> Plan and supplement it with a section cross-referencing the location of requirements in 40 CFR 112 and <br /> the equivalent Plan. Immediately amend the Plan to include a cross-reference or to follow the required <br /> sequence. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> Stacy Rivera (209) 468-3440 pa/(Qey�,ejnd/&d <br /> EHD 23-02-003 Rev 04/19/12 CONTINUATION FORM <br />