Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sjgov.om/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> Faculty Martin-Brower Co. Fd4704 Fite Ct., Stockton Inspection Jun 20, 2011 <br /> Name: Address: <br /> s: Date: <br /> VIOLATIONS <br /> # V RCode Section HSC=CA Health and SafetyCode;CFR=Code of Federal Regulations;V=Violation RV=Repeat violation <br /> Specific requirements of HSC 25270.4.5 a are identified as CFR code sections beginning with 112 <br /> Failed to:test each aboveground container for integrity on a regular schedule or when repairs were made; <br /> 48 X CFR 112.8(c)(6) inspect containers and container supports;or keep records of inspections and tests,or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> 49 CFR 112.8(c)(7) Failed to provide effective leakage control through defective internal heating coils,or provide equivalence <br /> as allowed by CFR 11 2.7a 2 <br /> 50 X CFR 112.8(c)(8) Failed to install and regularly test approved liquid level sensing devices,or provide equivalence as allowed <br /> by CFR 112.7a 2 <br /> 51 CFR 112.8(c)(9) Failed to observe effluent treatment facility frequently enough to detect system upsets that could cause a <br /> discharge,or provide equivalence as allowed by CFR 11 2.7a 2 <br /> 52 CFR 112.8(c)(10) Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas,or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> 53 CFR 112.8(c)(11) Failed to locate portable containers to prevent discharge or provide sufficient secondary containment <br /> capacity that will hold the volume of the largest container plus sufficient freeboard to contain precipitation <br /> Failed to provide buried piping with a protective wrapping and coating and cathodic protection and/or <br /> 54 CFR 112.8(d)(1) inspect buried piping for corrosion damage when exposed,or provide equivalence as allowed by CFR <br /> 112.7(a)(2) <br /> 55 CFR 112.8(d)(2) Failed to cap or blank-flange terminal connection at transfer point and mark its origin when piping is not in <br /> service or in standby service for an extended time,or provide equivalence as allowed by CFR 11 2.7a 256 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion and corrosion and to allow for expansion and <br /> contraction,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 57 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances,or provide equivalence as <br /> allowed by CFR 112.7(a)(2) <br /> 58 CFR 112.8(d)(4) Failed to conduct integrity and leak test for buried piping at time of installation,modification,construction, <br /> relocation,or replacement,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 59 CFR 112.8(d)(5) Failed to provide adequate warnings to vehicles entering facility to protect aboveground piping and other <br /> oil transfer operations,or provide equivalence as allowed by CFR 11 2.7a 2 <br /> 999 Other: I See attached"Continuation-Official Inspection Report"for violation(s)not listed above. <br /> ROUTINE ABOVEGROUND PETROLEUM STORAGE ACT (APSA) INSPECTION <br /> "Inspection report revised on July 6, 2011 to include a description of violation #32. Violation #32 was <br /> included in the original checklist issued June 20, 2011. <br /> Violations: (8, 10, 18, 24, 32, 48, 50) <br /> 8. The Spill Prevention, Countermeasure, and Control (SPCC) Plan on site states that a petroleum filter is <br /> being used on the storm drain closest to the aboveground diesel tanks. A petroleum filter was not <br /> observed on the storm drain and facility personnel were unfamiliar with this practice. The SPCC Plan <br /> must be amended when there is a change in the facility design, construction, operation, or maintenance <br /> that materially affects its potential for a discharge, within 6 months of the change, and implemented as <br /> soon as possible, not later than 6 months following preparation of the amendment. Immediately make all <br /> necessary amendments to the SPCC Plan to accurately represent the procedures and policies currently <br /> in place at the facility. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY <br /> RAT . S FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Inspector: Phone: Received By. Title: <br /> (2 9)468-3440 <br /> EHD 28 2 R /19/10 Page 3 APSA INSPECTION REPORT <br /> 4is 1191,0 <br />