My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 4:47:44 PM
Creation date
10/11/2018 2:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax: (209)468-3433 Web:www.sogov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 06/20/11 <br /> Facility Address: 4704 Fite Ct., Stockton REVISED 7/6/11 Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II, or MINOR-Notice to Comply) <br /> 10. The SPCC Plan was certified on May 1, 2006. According to the cover sheet, the Plan was reviewed <br /> and recertified in February 2007. No record of a review or additional certification could be located. A <br /> review and evaluation of the plan must be conducted at least once every 5 years. You must document <br /> your completion of the review and evaluation, and must sign a statement as to whether you will amend <br /> the Plan, either at the beginning or end of the Plan, or in a log or appendix to the Plan. As a result of <br /> this review and evaluation, the SPCC Plan must be amended within 6 months of review, and recertified <br /> by a professional engineer if any technical amendments were made. Immediately conduct a review of <br /> the facility SPCC Plan and make any necessary amendments. <br /> 18. A facility diagram was not included with the Plan. The Plan shall include a facility diagram which <br /> must mark the location and contents of each fixed storage container and the storage area where mobile <br /> or portable containers are located. It must also include all transfer stations and connecting pipes, <br /> including intra-facility gathering lines. Immediately provide a facility diagram which includes all of the <br /> required information. Submit a legible copy of the facility diagram to the EHD by July 20, 2011. <br /> 24. The contact information for the San Joaquin County Office of Emergency Services (SJC OES) was <br /> not included in the SPCC Plan. The SPCC Plan must include a contact list and phone numbers for the <br /> facility response coordinator, National Response Center, cleanup contractors with whom you have an <br /> agreement for response, and all appropriate federal, state, and local agencies who must be contacted in <br /> case of a discharge. Immediately update the contact list to include the most current version of the <br /> required information. <br /> 32. Annual training is not being conducted for the aboveground petroleum storage program and <br /> containers. At a minimum, oil-handling personnel must be trained in the operation and maintenance of <br /> equipment to prevent discharges, discharge procedure protocols, applicable pollution control laws, rules <br /> & regulations, general facility operations, and the contents of the facility's SPCC Plan. Annual briefings <br /> must be conducted to assure adequate understanding of the SPCC Plan and highlight and describe any <br /> known discharges or failures, malfunctioning components, and any recently developed precautionary <br /> measures. Immediately conduct necessary training for all oil handling personnel. Submit copies of <br /> training records to the EHD by July 20, 2011. <br /> 48. Integrity testing has not been conducted on the motor oil and diesel tanks. The facility shall test or <br /> inspect each aboveground container for integrity on a regular schedule and whenever you make material <br /> repairs. Examples of these integrity tests include, but are not limited to: visual inspection, hydrostatic <br /> testing, radiographic testing, ultrasonic testing, acoustic emissions testing, or other systems of non- <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received Bye Title: <br /> EHD 23-02-00 R 8/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.