Laserfiche WebLink
Item Task Status Comments <br /> c. Make sure fusible I iYes I iNo* I iN/A <br /> element is in place <br /> and correctly <br /> positioned. <br /> d. Be sure test ports I]Yes ❑No* ❑N/A <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check condition of []Yes []No* ❑N/A <br /> leak detection equipment, including: <br /> equipment . The window is <br /> clean and clear in <br /> sight leak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button, if <br /> applicable. <br /> 5.4 Spill a. If corrosion, []Yes* []No ❑N/A <br /> containment damage, or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containment functions, <br /> replace the unit. <br /> b. Inspect the C Yes* I No ❑N/A <br /> connections to the <br /> AST for tightness, as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if necessary. <br /> c. Drain valves must []Yes* []No ❑N/A <br /> be operable and <br /> closed <br /> 5.5 Strainer a. Check that the []Yes []No* ❑N/A <br /> strainer is clean and in <br /> good condition. <br /> AST INSPECTION STANDARD 10 SEPTEMBER 2011 <br /> COPYRIGHT©2011 Steel Tank Institute <br />