My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 3:55:34 PM
Creation date
10/17/2018 4:58:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> California Health Care Facility 7707 Austin Rd, Stockton September 04, 2014 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 724 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service V R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE) missing or incomplete. <br /> The cumulative aboveground petroleum storage at this facility is 42,000 gallons. The Professional Engineer (PE) <br /> certification is incomplete: PE stamp, signature, date and registrations numbers are lacking. The PE certification must <br /> include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is familiar with 40 CFR Part 112, he or <br /> his agent has visited and examined the facility, the Spill Prevention, Control, and Countermeasure (SPCC) Plan has <br /> been prepared in accordance with good engineering practice, including consideration of applicable industry standards, <br /> procedures have been established for required inspections and testing, and the Plan is adequate for the facility. <br /> Immediately obtain a complete PE certification for the facility's SPCC Plan. Submit a copy of the completed certification <br /> to the EHD. This is a Class II violation. <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan. <br /> The management approval on page iv of the Spill Prevention, Control, and Countermeasure(SPCC) Plan is lacking. <br /> The SPCC must have the full approval of management at a level of authority to commit the necessary resources to fully <br /> implement the Plan. Immediately obtain required management approval for the SPCC Plan for this facility. This is a <br /> Class II violation. <br /> 604 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers, transfer stations, and pipes. <br /> Facility's diagram included in the SPCC plan did not depict the existing inter facility connecting pipes associated with <br /> the onsite above ground petroleum storage. The Spill Prevention, Control, and Countermeasure (SPCC) Plan shall <br /> include a facility diagram which must mark the location and contents of each fixed storage container and the storage <br /> area where mobile or portable containers are located. It must identify the location of and mark as"exempt" <br /> underground tanks. It must also include all transfer stations and connecting pipes, including intra-facility gathering lines. <br /> Immediately update the facility diagram to include all of the required information. Submit a legible copy of the updated <br /> facility diagram to the EHD for review. This is a Class II violation. <br /> Receiv�b initial): Inspector: Phone: Date: <br /> ELENA MANZO, REHS (209) 953-7699 09/04/2014 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.