My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 3:55:34 PM
Creation date
10/17/2018 4:58:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Heal.11 Care Facility <br /> Corrective Action Plan -Above Ground Petroleum Storage Act <br /> November 12, 2014 <br /> Compliance <br /> Violation Correction <br /> Item# Description Date <br /> The Professional Engineer(PE)certification is incomplete: PE <br /> stamp,signature,date and registration numbers are lacking.The <br /> PE certification must include all of the aspects in the 40 CFR <br /> 112.3(d)(1) including attesting that the PE is familiar with 40 CFR <br /> Part 112, he or his agent has visited and examined the facility, <br /> Plan certification by a the Spill Prevention Control and Countermeasure(SPCC) plan has <br /> 201 Professional Engineer 1/5/2015 been prepared in accordance with good engineering practice, Please see Exhibit 1 <br /> missing or incomplete including consideration of applicable industry standards, <br /> procedures have been established for required inspections and <br /> nesting,and the plan is adequate for the facility. Immediately <br /> obtain a complete PE certification for the facilities SPCC plan. <br /> Submit a copy of the completed certification to the EHD.This is <br /> a class II violation. <br /> Plan lacks approval of The SPCC must have the full approval of management at a level <br /> management to fully of authority to commit the necessary resources to fully Upon receipt of completed SPCC plan <br /> 602 commit the necessary 1/5/2015 implement the plan. Immediately obtain required management approval of management will be <br /> resources to implement the approval for the SPCC Plan for this facility.This is a Class II obtained <br /> plan violation. <br /> M <br /> C <br /> a 0 M <br /> � � o <br /> M 0 <br /> M <br /> � r o <br /> � m <br /> M <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.