My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
805
>
2800 - Aboveground Petroleum Storage Program
>
PR0516480
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 4:01:54 PM
Creation date
10/19/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516480
PE
2832
FACILITY_ID
FA0010466
FACILITY_NAME
CALIFORNIA FREIGHT SALES
STREET_NUMBER
805
Direction
S
STREET_NAME
LOCUST
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25935010
CURRENT_STATUS
01
SITE_LOCATION
805 S LOCUST AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s'gov.org/ehd/unitiii.html <br />CONTINUATION FORM <br />Page: 4 of 4 <br />OFFICIAL INSPECTION REPORT <br />Date: 03/13/12 <br />Facility Address: 805 Locust Avenue, Ripon <br />Program: APSA <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />101. Facility has an APSA regulated shell capacity of 12,775 gallons. No Spill Prevention & <br />Countermeasure Control (SPCC) Plan was available for the site. All facilities which have an APSA <br />regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of <br />the requirements of the Code of Federal Regulations Title 40, Part 112. This plan shall be certified by a <br />professional engineer in accordance with 40 CFR 112.3(d). Immediately prepare a SPCC Plan in <br />accordance with 40 CFR Part 112, which will include all aboveground petroleum storage containers 55 <br />gallons or larger. Submit a copy of the Professional Engineer (PE) certified SPCC Plan to the EHD for <br />review within 30 days of receiving this report. (This copy will be returned to the facility after review.) A <br />copy shall be maintained on site at all times. <br />Notes <br />Complete and submit a copy of the Return to Compliance Certification form with a statement of how <br />each violation was corrected, including supporting documentation, to the EHD within 30 days of <br />receiving this report. <br />Facility has new owner. the old SPCC plan was for Jim Aartman Inc - no longer exists. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: <br />Muniappa Naidu (209) 468-3439 <br />Received By: <br />Title: <br />EHD 23-02-003 Rev 07/12/11 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.