Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sioov.orci/ehd/unitiii.html <br />ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br />CONTINUED <br />Facility Facility Inspection <br />Name Ruan Address 805 Locust Avenue, Ripon Date Mar 13, 2012 <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code Section <br />HSC = CA Health and SafetyCode; CFR = Code of Federal Regulations <br />C1 = Class 1 violation; C2 = Class 2 violation: M = Minor violation <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) (continued) <br />605 <br />CFR 112.8(b)(5) <br />Failed to provide two "lift" pumps, one permanently installed, where drainage waters are continuously <br />treated in more than one treatment unit, or provide equivalence as allowed by CFR 11 2.7 a 2 <br />606 <br />CFR 112.8(c)(1) <br />Container not compatible with oil stored and/or storage conditions, or failed to provide equivalence as <br />allowed by CFR 11 2.7 a 2 <br />Failed to provide sufficient secondary containment capacity for a bulk storage tank that would hold the <br />607 <br />CFR 112.8(c)(2) <br />volume of the largest container plus sufficient freeboard to contain precipitation and/or diked area is not <br />sufficiently impervious to contain discharged oil <br />Allowed drainage of uncontaminated rainwater from a diked area and failed to: (i) keep bypass valves <br />608 <br />CFR 112.8(c)(3) <br />sealed closed; (ii) inspect retained rainwater prior to discharge; (iii) open bypass valve and reseal it <br />under responsible supervision, (iv) maintain adequate records of such events, or provide equivalence <br />as allowed by CFR 112.7(a)(2) <br />Failed to: test each aboveground container for integrity on a regular schedule or when repairs were <br />609 <br />CFR 112.8(c)(6) <br />made, inspect containers and container supports, or keep records of inspections and tests, or provide <br />equivalence as allowed by CFR 112.7(a)(2) <br />610 <br />CFR 112.8(c)(7) <br />Failed to provide effective leakage control through defective internal heating coils, or provide <br />equivalence as allowed by CFR 11 2.7 a 2 <br />611 <br />CFR 112.8(c)(8) <br />Failed to install and regularly test approved liquid level sensing devices, or provide equivalence as <br />allowed by CFR 112.7(a)(2) <br />612 <br />CFR 112.8(c)(9) <br />Failed to observe effluent treatment facility frequently enough to detect system upsets that could cause <br />a discharge. or provide equivalence as allowed by CFR 112.7(a)(2) <br />613 <br />CFR 112.8(c)(10) <br />Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas, or <br />provide equivalence as allowed by CFR 112.7(a)(2) <br />Failed to locate portable containers to prevent discharge or provide sufficient secondary containment <br />614 <br />CFR 112.8(c)(11) <br />capacity that will hold the volume of the largest container plus sufficient freeboard to contain <br />precipitation <br />Failed to provide buried piping with a protective wrapping and coating and cathodic protection and/or <br />615 <br />CFR 112.8(d)(1) <br />inspect buried piping for corrosion damage when exposed, or provide equivalence as allowed by CFR <br />112.7 a 2 <br />Failed to cap or blank -flange terminal connection at transfer point and mark its origin when piping is not <br />616 <br />CFR 112.8(d)(2) <br />in service or in standby service for an extended time, or provide equivalence as allowed by CFR <br />112.7 a 2 <br />617 <br />CFR 112.8(d)(3) <br />Failed to design pipe supports to minimize abrasion and corrosion and to allow for expansion and <br />contraction, or provide equivalence as allowed by CFR 112.7 a 2 <br />618 <br />CFR 112.8(d)(4) <br />Failed to regularly inspect aboveground valves, piping, and appurtenances, or provide equivalence as <br />allowed by CFR 11 2.7 a 2 <br />619 <br />CFR 112.8(d)(4) <br />Failed to conduct integrity and leak test for buried piping at time of installation, modification, <br />construction, relocation, or replacement, or provide equivalence as allowed by CFR 11 2.7 a 2 <br />620 <br />CFR 112.8(d)(5) <br />Failed to provide adequate warnings to vehicles entering facility to protect aboveground piping and <br />other oil transfer operations, or provide equivalence as allowed by CFR 112.7 a 2 <br />Other Violations <br />999 f0ther See attached "Continuation - Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR -Notice to Comply) <br />I ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. I <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE <br />Inspector Received By Title <br />&J" 0� W c� Cd i, 17-1 c ,_L !n I <br />EHD 28-02 Rev 03/09/12 Page 3 APSA INSPECTION REPORT <br />