My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
12988
>
2800 - Aboveground Petroleum Storage Program
>
PR0516680
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 5:25:20 PM
Creation date
10/19/2018 4:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516680
PE
2831
FACILITY_ID
FA0004175
FACILITY_NAME
TIKI LAGUN RESORT & MARINA
STREET_NUMBER
12988
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
13102026
CURRENT_STATUS
01
SITE_LOCATION
12988 W MCDONALD RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.10 and 6.11 of the standard for alternatives for Category 1 <br /> tanks.N/A is only appropriate for these alternatives, es ❑ No ❑ NIA <br /> 5 For double-wail or double bottom tanks or CE-ASTs, is interstitial monitoring equipment <br /> (where applicable)in good working condition? es ❑ No ❑ NIA <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? <br /> Remove the liquid if It is found.If tank product is found,Investigate possible leak. es ❑ No ❑ N/A <br /> Equipment on tank <br /> 7 If overfill equipment has a'test"button,does it activate the audible hom or light <br /> to confirm operation?If battery operated,replace battery if needed. ❑Yes ❑ No <br /> 8 Is overfill prevention equipment in good working condition?If it is equipped with a A <br /> mechanical test mechanism,actuate the mechanism to confirm operation, <br /> es ❑ ❑N/A <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working <br /> condition? <br /> es ❑ No /A <br /> 10 Are Piping connections to the tank(valves,fittings,pumps,etc.)free of visible leaks? <br /> Nola:ff No"identify/oca8on and describe leak. <br /> No <br /> 11 Do the ladders/platforms/walkways appear to be secure with no sign of severe corrosion <br /> or damage? <br /> es ❑ No a N/A <br /> Containment(Diking%pounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards and <br /> other integrity issues? <br /> es No ❑ N/A <br /> 13 Are dike drain valves dosed and in good working condition? <br /> es o ❑ N/A <br /> 14 Are containment egress pathways clear and any gatestdoors operable? <br /> es ❑ No ❑ N/A <br /> Concrete Exterior AST(CE"AST) <br /> 15 Inspect all sides for cracks in concrete. Are there any cracks In the exterior larger <br /> than 1/16"? conGete <br /> ❑Yes o ❑ N/A <br /> 16 Inspect concrete exterior body of the tank for cleanliness,need of coating,or rusting where <br /> applicable. Tank exterior in acceptable condition? <br /> es o ❑ N/A <br /> Visual inspect all tank top openings including nipples,manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact <br /> and in good condition? Yes ❑ NO /A <br /> Other Conditions <br /> 18 Is the system free of any other conditions that need to be addressed for <br /> continued safe operation? <br /> Yes ❑No <br /> Monthly Checklist <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.