My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
12988
>
2800 - Aboveground Petroleum Storage Program
>
PR0516680
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 5:25:20 PM
Creation date
10/19/2018 4:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516680
PE
2831
FACILITY_ID
FA0004175
FACILITY_NAME
TIKI LAGUN RESORT & MARINA
STREET_NUMBER
12988
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
13102026
CURRENT_STATUS
01
SITE_LOCATION
12988 W MCDONALD RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Is the primary tank free of water or has another preventative measure been taken? <br /> 4 !VOTE: Refer to paragraphs 6.10 and 6.11 of the standard for alternatives for Category 1 <br /> tanks,N/A is only appropriate for these alternatives. es ❑No ❑N/A <br /> 5 For double-wall or double bottom tanks or CE-ASTs,is interstitial monitori <br /> (where applicable)in good working condition? MJ equipment <br /> es ❑ No q <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? <br /> Remove the liquid if it Is found.if tank product Is found,investigate possible leak es ❑No ❑ N/A <br /> Equipment on tank <br /> 7 if overfill equipment has a"test"button,does it activate the audible horn or light <br /> to confirm operation?If battery operated,replace battery if needed ❑Yes ❑ No <br /> 8 Is overfill prevention equipment In good working condition?lf it is equipped with a A <br /> mechanical test mechanism,actuate the mechanism to confirm operation. es ❑ NO ❑ N/A <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working <br /> condition? <br /> Yes ❑ No N/A <br /> 10 Are Piping connections to the tank(valves,fittings,pumps,etc.)free of visible leaks? <br /> Nota:ff'Alb", identNy foca8on and describe leak, <br /> es a No <br /> 11 Do the laddersfplatformsAvalkways appear to be secure with no sign of severe corrosion <br /> or damage? <br /> es ❑ No ❑ N/A <br /> Containment(Dikinglimpounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire h <br /> other integrity issues? azards and <br /> es o EI N/A <br /> 13 Are dike drain valves dosed and in good working condition? <br /> 41 es ❑ ❑N/A <br /> 14 Are containment egress pathways clear and any gates/doors operable? <br /> cr es ❑No ❑ N/A <br /> Concrete Exterior AST(CE-AST) <br /> 15 Inspect all sides for cracks in concrete. Are there any cracks in the concrete exterior larger <br /> than 1116"? <br /> ❑Yes ❑ N/A <br /> i8 Inspect concrete exterior body of the tank for cleanliness,need of coati <br /> applicable. Tank exterior In acceptable condition? or rusting where <br /> es ❑ No ❑ N/A <br /> Usual inspect all tank top openings including nipples,manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant <br /> and in good condition? between all tank top openings and concrete intact <br /> es ❑ No ❑ N/ <br /> Other Conditions <br /> is Is the system free of any other conditions that need to be addressed for <br /> continued safe operation? <br /> Yes ❑ No <br /> Monthly Checklist <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.