Laserfiche WebLink
i <br /> Is the Primary tank free of water or has another <br /> 4 NOTE.- Refer to Pmverrfative measure been taken? <br /> tanks.WA Is only <br /> 6for and a 1 of Iha standard for alternatives for Ca <br /> Y adouble o for mese alternatives. Ory 1 ZlA%S- ❑No ❑ N/A <br /> s For double-watt or double bottom banim or CE-ASTs,is Int <br /> {where epPUcable)In good wor(dnp cond#bn? interstitial monfork V equipment <br /> 6 Fordouble-wa[f t8ks or do es ❑ No ❑N/A <br /> Remove the ti able botbm tanks or CE-ASTs,is lntwstics free of Ilquid? <br /> quid fi k Is found.ff tank IModuc#to iburd, POGISIble leak <br /> es ❑ No ❑N/A <br /> E4WPment on tank <br /> If overfill ui 'test.button, <br /> doe,to coriflrmoperation?If sry operated, it activate the audible horn or dight <br /> is `�'� Y ff needed. 11 Yes ❑No <br /> 8 overfill Prevention eq'uiPrnent In <br /> rrxxhanical bast merhanfsm,adx ate Id g 111don?If k is equipped with a <br /> is nrechanism to confirm operation. s ONO ❑N/A <br /> s� t finer(spill bucket em We I <br /> PtY.free of vtsi and In good working <br /> 10 AmNotPiP1 connections to the ngs,P es o No N/A <br /> . tank{valves,frn amps,etc)free of visible leaks? <br /> /dsnb y k�cattou and desryr7re!leak. <br /> 1.1 bO the ladderslplatfom? ❑Yes ❑No <br /> or damage? alkways appear to be secure with no sign of severe cor►osion <br /> es ❑No ❑N/A <br /> C°"falnr"ent <br /> 12 Is the containment free (Dll ingfbnPou <br /> of a liquid,debris,tracks,��� <br /> other integrity Issues? erosion,fire hazards and <br /> i3 Are dike drain valves8 ❑No ❑N/A <br /> dosed and In good working wndrtbn? ' <br /> 14 ,are co►rta4urrerrtes ❑N/A <br /> egress Pathways dear and any gatesldoors operable? <br /> es ❑No ❑N/A . <br /> Grabs Bdw for AST(CE-A" <br /> is -inspect all skies for cracks in concrete. ArE <br /> than 1/1817 tfrere any cxadaa In the concrete exterior larger <br /> insped Wderlor °Yes o ❑N/A <br /> 16 aPPlicable. Tank <br /> exkNior In ay of the tank lb�condition?d8anlinewneed of coating,or rusting yvfe <br /> 17 Visual Inspect all tank top openings Indudi as ° 0 13 N/A <br /> and leak detection tubes. is the sealant �nipples,manways,tank bop overfill containers, <br /> and in good condition? between all tank bop opener and concrete intim <br /> es ❑ No ❑N/A <br /> Isthe �'ConcNtiaos <br /> 1a 'stem free of a <br /> oorrtlr uedsafe operation? �ondltkons that need to be addressed fur <br /> es ❑ No <br /> Monthly Checklist <br /> Page Z of 3 <br />