Laserfiche WebLink
h 4 � <br /> f <br /> I <br /> 2449 Kettleman, Lodi, Chronology <br /> Page 2 <br /> 01/09/03 Date of EHD letter on the.CAP and directing additional vertical <br /> assessment. <br /> I <br /> 03/03/03 Date of CPT investigation and colle tion of soil and groundwater samples <br /> downgradient of the former USTs to define the vertical extent of <br /> contamination. <br /> 05/15/03 EHD received CPT groundwater results (ND below 65 feet). Plume now <br /> defined and the CAP can be implemented using the proposed groundwater <br /> pump and treat. <br /> I <br /> 05/30/03 Date of EHD letter approving the CAP. <br /> 04/14/04 EHD inspection verified the groundwater pump and treat in operation. <br /> 06/23/04 Groundwater pump and treat system shutdown verified by EHD <br /> inspection. <br /> 05/05/05 EHD staff dicussed the Final Closure Report (Groundwater Monitoring <br /> Report dated January 18, 2005) prepared by Foothill with the Central <br /> Valley Regional Water Quality Control Board staff who indicated the site <br /> could be considered for NFAR after a sensitive receptor survey was <br /> completed and no wells were identif ed near this site. <br /> 07/21/05 EHD reviewed Foothill's sensitive r ceptor survey dated June 6, 2005, <br /> with a revision of July 14, 2005. <br /> i <br />