Laserfiche WebLink
calcium chloride to facilitate a quick return to traffic. AIC and concrete surfacing will be cored or <br /> saw cut. Underground Service Alert will be notified at least 48 hrs prior to saw cutting/coring and <br /> over excavation. Of particular concern will be the location of traffic loops and the home run <br /> pathway on Highway 12. <br /> Disposal of Trernie Water <br /> Ground water displaced by tremie grouting will be co lected and spread out in the equipment pit and <br /> allowed to evaporate and become part of the backfill f the equipment pit. From the standing water <br /> column measurements performed. on 5/31/05 there will be about 22 gallons of ground water <br /> displaced by the tremie grout. <br /> Equiument PitPit <br /> Currently Foothill Engineering is waiting for a get of as built drawings on the equipment pit and the <br /> conduit and sewer piping. Removal of the pit will be performed separate from the well <br /> abandonment. <br /> Please call (91 f) 729-5184 i uestions. or concerns. <br /> e�°��RaBERT�Fy <br /> Thank you, <br /> � c3 <br /> Foothill Eng' eerin C 57707 <br /> /��z <br /> XP. - 1-05 <br /> T9 C IV 0 ��P (� �d <br /> Michael Vlach, P.E. jFor <br /> cc: Diana Maragos, Attorney for Sun West Liquors, W. T. Mitchell Group <br />