My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004082
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2449
>
3500 - Local Oversight Program
>
PR0543823
>
ARCHIVED REPORTS XR0004082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 1:08:58 PM
Creation date
10/22/2018 10:41:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0004082
FileName_PostFix
XR0004082
RECORD_ID
PR0543823
PE
3528
FACILITY_ID
FA0003760
FACILITY_NAME
SUNWEST LIQUORS
STREET_NUMBER
2449
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
02741005
CURRENT_STATUS
02
SITE_LOCATION
2449 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Five water level probes <br /> • Generator <br /> ' • Total flow meter <br /> • Totalizer <br /> ' • Discharge hose <br /> • Gas cans <br /> ' Materials List <br /> • Two disposable bailers <br /> ' Brass Tubes (4) <br /> • Masking tape <br /> • Table and chair <br /> ' • Cable to secure pump <br /> • Extension cords <br /> • Gloves <br /> i • Sample ice chest and containers (groundwater and carbon) <br /> • Barricades and cones <br /> ' GROUNDWATER EXTRACTION TEST <br /> On January 29, 2002 Alex and John will mobilize to the site in the morning. The Baker tank is <br /> scheduled for deliver to the site at 0700. The activated carbon is scheduled for deliver in the <br /> morning on January 29, 2002. Either Alex or John should try and get there around 0700, so <br /> ' need to do most of the prep the afternoon before. <br /> January 29, 2002 <br /> ' a Be there for Baker tank delivery around 0700. <br /> • Unlock all wells and allow groundwater levels to equilibrate. <br /> ' Set up barricades around wells and set up table in drive-up lane. <br /> • Collect a groundwater sample from the extraction well prior to test (no purging required). <br /> • Install pump into well. <br /> ' Set up test and get started hopefully by 0900 to 0930. <br /> • Do a drum inventory of the site and collect one 4-tube composite soil sample from the <br /> drummed soil cuttings. Submit soil sample to Argon Labs for analysis of TPHg, BTEX, <br /> ' seven oxygenates, and total lead on a standard turnaround time. <br /> • Once the test has begun, John will deliver the groundwater sample collected from the <br /> extraction well to Argon for immediate analysis. Deliver soil sample too on standard <br /> ' turnaround time. John will then go to Stockton and mark Franklin for USA and return to -- <br /> Lodi to help Alex finish the pump test. <br /> t Identify the sewer discharge point to be used after the water has been remediated. There <br /> is suppose to be a stormwater discharge point and a sewer discharge point inside the <br /> remediation compound area (installed by the developer). <br /> • Do a step test to determine maximum sustainable flowrate. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.