Laserfiche WebLink
. 34 <br /> second ago . I think it was thelmap that was attached to <br /> 2 the addendum to the work plan . . <br /> 3 Do you have that handy again? Is this the <br /> 4 one? <br /> 5 A . Yeah, there we go . <br /> 6 Q . At this point, did the pit include the three <br /> 7 boring holes? <br /> 8 A . When we were finished excavating, the pit <br /> 9 had included several of the boding holes Just up to the <br /> 10 bore hole and stopped . We hit concrete and stopped . <br /> 11 Q . At the time that the floor samples were <br /> 11 12 taken, was it, I guess I 'm trying to get a good <br /> i' <br /> 13 visualization of where those fi3nol floor samples were <br /> 14 taken in relation to the boring holes? <br /> 15 A . The bottom samples3llyou are referring to? <br /> 16 Q . Yes . <br /> 17 A . The bottom sample was taken in the center <br /> i <br /> 18 between the north and south and along the western edge <br /> 19 so it would be north and south land western edge of the <br /> 20 bottom sample . It would be more or less right in this <br /> I� <br /> 21 area here (indicating) , about 30 feet . <br /> 22 Q . Okay . Okay . So within an approximate <br /> i <br /> 23 15-foot diameter circle or radius rather, of the <br /> I� <br /> 24 original boring sample or the Original sample that <br /> CJ <br /> 25 detected 600 parts per million and the 1304 per million; <br /> I� <br /> I <br /> PORTALE & ASSOCIATES ' (209 ) 462-3377 <br />