My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1501
>
2900 - Site Mitigation Program
>
PR0516318
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 4:53:37 PM
Creation date
10/22/2018 4:10:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516318
PE
2950
FACILITY_ID
FA0012555
FACILITY_NAME
EL CONCILIO NO 1 PROPERTY
STREET_NUMBER
1501
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16902011
CURRENT_STATUS
01
SITE_LOCATION
1501 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i vrdoq vM en.inwwen44r. <br /> 3. Project Objectives <br /> 3.3 Decision Rules <br /> The decision rules for TBAs are presented in the Draft TBA SAP. <br /> 3.4 Data Quality Objectives <br /> The data quality objective(DQO) process, as set forth in the U.S. EPA document, Guidance for <br /> the Data Quality Objectives Process (EPA QA/G-4), was followed to establish the data quality <br /> objectives for this project. The draft Generic DQO for TBAs is contained in Appendix B of the <br /> TBA SAP. The specific outputs generated during the DQO process will be archived with the <br /> field log book and other project documents. <br /> 3.4.1 Data Type <br /> The data type requirement for this TBA is presented in the TBA SAP. <br /> 3.4.2 Data Quality Indicators <br /> The site-specific data quality indicator(DQI) goals for soil and groundwater for this TBA are <br /> presented in Tables 1 and 2, respectively(Appendix B). Additional discussion of DQI goals and <br /> DQIs is included in the Draft TBA SAP. <br /> 3.5 Data Management <br /> The data management requirements for the TBA are presented in the TBA SAP. <br /> 3.6 Schedule of Sampling Activities <br /> The field sampling activities will commence in August 2010 and are anticipated to take <br /> approximately three field days to complete. <br /> 3.7 Special Training Requirements/Certifications <br /> Special training and certification requirements for this TBA are presented in the TBA SAP. <br /> 14:002693.1401.01BR 3-2 <br /> EI Concilio No.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.