My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1501
>
2900 - Site Mitigation Program
>
PR0516318
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 4:53:37 PM
Creation date
10/22/2018 4:10:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516318
PE
2950
FACILITY_ID
FA0012555
FACILITY_NAME
EL CONCILIO NO 1 PROPERTY
STREET_NUMBER
1501
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16902011
CURRENT_STATUS
01
SITE_LOCATION
1501 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wdi�'eM emfnnmenl.�. <br /> 6. Field Methods and Procedures <br /> 6.2 Groundwater Sampling Procedures <br /> After the collection of soil samples, a direct-push drilling rig will be advanced to groundwater. A <br /> temporary 1-inch polyvinyl chloride screen will be placed in the boring,and groundwater <br /> samples will be collected using a disposal bailer and placed into new pre-cleaned, certified <br /> sampling containers. Water samples will be placed in coolers and chilled with ice to VC for <br /> storage and shipping to the analytical laboratory. <br /> Duplicate groundwater samples will be collected in the same manner and two sets of sample <br /> containers will be filled. Groundwater samples will be collected in accordance with the following <br /> standard operating procedures contained in Appendix D of the TBA SAP: <br /> • Ecology and Environment, Inc. SOP#ENV 3.3: Borehole Sampling <br /> • Ecology and Environment, Inc. SOP#ENV 3.6: Groundwater Sampling Devices <br /> When sampling is completed, each borehole will be tremie grouted through the temporary well <br /> screen with neat cement and finished at the ground surface to match surrounding materials. <br /> 6.3 Decontamination Procedures <br /> The decontamination procedures used for this TBA are presented in the TBA SAP. <br /> 14:002693.I401.OIBR 6-2 <br /> El Cowilfu N..I <br />
The URL can be used to link to this page
Your browser does not support the video tag.