My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2255
>
3500 - Local Oversight Program
>
PR0518431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:01:21 AM
Creation date
10/23/2018 8:13:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0518431
PE
3528
FACILITY_ID
FA0013904
FACILITY_NAME
ZE AUTO REPAIR
STREET_NUMBER
2255
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16908055
CURRENT_STATUS
02
SITE_LOCATION
2255 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Abdelwahed Facility, Ultrar�Site No. 13792 %.1 May 5, 2012 <br />Stockton, California Work Plan Well for DPE Well Installation and Soil Gas Investigation <br />Task 2 Disconnect VES piping from the MW-1 well head; drill out well MW-1 well <br />with a 8-inch diameter auger to a depth of 56 feet below surface grade (bsg); <br />backfill boring with neat cement; and restore the surface. <br />Task 3 Document the well destruction and update GeoTracker as necessary. <br />Proposed Monitoring (DPE) Well Installation <br />Proposed tasks for monitoring well installation will include drilling, installation, <br />development and sampling. It is possible that analytical results for groundwater samples <br />collected from the replacement monitoring well will reveal that formation water is not <br />impacted to the extent indicated by current analytical data from well MW -1. In this case, it <br />would be unnecessary to conduct DPE remediation. Tasks to complete a potential DPE <br />remedial action, if deemed necessary, are included in this work plan. Some aspects of the <br />proposed DPE remedial action may be amended in response to data collected subsequent to <br />installation and sampling of the new well. <br />The location of the proposed monitoring well is shown on Figure 4. Preliminary well <br />construction details for the proposed monitoring/DPE well are shown on the attached <br />Typical Well Construction Diagram. The actual screen interval of the DPE well will be <br />evaluated on the basis of the depth of water encountered during drilling. The proposed drill <br />out and well installation work shall consist of the following tasks: <br />Task I Select and schedule a C-57 licensed drilling contractor to provide hollow - <br />stem auger drilling and well installation services; obtain required well permit <br />from the EHD; and prepare a Site Health and Safety Plan. <br />Task 2 Drill new 10 -inch diameter boring to 60 feet bsg; construct a DPE well <br />utilizing 4 -inch inside diameter casing screened from 30 to 60 feet bsg; actual <br />screen interval may be adjusted depending on the water depth encountered <br />during the field activities. <br />Task 3 Develop and sample the well; survey the location and top -of. -casing (TOC) <br />elevation of the new well to GeoTracker specifications. <br />Task 4 Collect an additional groundwater sample from the DPE well 1 to 2 months <br />after collection of the initial sample to confirm groundwater conditions; <br />submit groundwater samples, with chain -of -custody documentation, to a <br />state -certified analytical laboratory; analyze groundwater sample for total <br />petroleum hydrocarbons as gasoline (TPHg), the volatile aromatics benzene, <br />toluene, ethylbenzene and xylenes (BTEX); fuel oxygenate methyl -t -butyl <br />ether (MTBE), lead scavenger 1,2-dichloroethane (DCA) by EPA Method <br />8260B. <br />1792 DPE Well WP <br />Project No. 1792.26 3 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.