Abdelwahed Facility, UltraWSite No. 13792 V May 5, 2012 <br />Stockton, California Work Plan Well for DPE Well Installation and Soil Gas Investigation <br />Task 5 Document the over-drilling activities, well replacement installation, and <br />groundwater sampling data. <br />Contingent DPE Work Plan <br />The scope of work for the contingent DPE remedial action will be developed on the basis of <br />the tasks outlined below. It may be appropriate to refine this scope of work or to cancel the <br />DPE remedial action on the basis of groundwater analytical results from the MW -1 <br />replacement well. The purpose of the DPE remedial action, if necessary, would be to extract <br />impacted groundwater and, in the process, locally draw down the water table and extract <br />adsorbed volatile hydrocarbons from exposed sub -water table soil. <br />The DPE method utilizes high -vacuum blower, capable of generating up to approximately <br />25 inches of mercury (Hg) vacuum, connected to a "stinger" hose inserted into the well with <br />the end of the set below the water table to extract groundwater and soil vapor. The stinger <br />hose is sealed off from the atmosphere at the well head to concentrate vacuum on the well <br />screen and the adjacent subsurface. Water and vapor are extracted, separated, treated and <br />discharged at the surface. Groundwater analytical samples collected before and after pilot <br />testing will provide data for evaluation of the effectiveness of DPE to reduce dissolved <br />hydrocarbon concentrations in groundwater. Groundwater sampling will be conducted in <br />accordance with the enclosed Horizon Field Methods and Procedures. The following tasks <br />are proposed to complete the DPE remedial action: <br />Task I Select a contractor to provide a truck -mounted DPE services; notify the San <br />Joaquin Valley Air Pollution Control District (APCD) of the proposed DPE <br />pilot testing and obtain permit, if necessary; obtain water discharge permit <br />from the local sanitary sewer department; and Update the site-specific Health <br />and Safety Plan to include issues related to the proposed DPE work. <br />Task 2 Collect depth -to -water (DTW) measurements from all site wells prior to <br />initiating and prior to terminating DPE pilot test; and utilize existing <br />groundwater monitoring data or collect a groundwater sample from the DPE <br />well prior to DPE remedial action. <br />Task 3 Conduct up to 5 days of DPE pilot testing on the new DPE well; measure and <br />record vacuum, vapor flow and hydrocarbon concentration readings, and <br />volume of extracted groundwater hourly for the first 4 hours of DPE <br />operation, and every 4 hours for the duration of the pilot test; treat, as <br />necessary, and discharge vapors directly to the atmosphere and groundwater <br />to the sanitary sewer; depending on water discharge requirements, treat <br />extracted groundwater through a sediment filter and granular -activated carbon <br />prior to discharge to the sanitary sewer system; if necessary, temporarily store <br />treated groundwater in an above -ground storage tank (3,000 to 6,000 gallons <br />capacity); if necessary, sample stored water for discharge analytical <br />characterization; collect a groundwater sample from DPE well immediately <br />1792 DPE Well WP <br />Project No. 1792.26 4 HORIZON ENVIRONMENTAL INC. <br />