My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2255
>
3500 - Local Oversight Program
>
PR0518431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:01:21 AM
Creation date
10/23/2018 8:13:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0518431
PE
3528
FACILITY_ID
FA0013904
FACILITY_NAME
ZE AUTO REPAIR
STREET_NUMBER
2255
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16908055
CURRENT_STATUS
02
SITE_LOCATION
2255 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Abdelwahed Facility, UltraSite No. 13792 May 5, 2012 <br />Stockton, California_ Work Plan Well for DPE Well installation and Soil Gas Investigation <br />Installation of the DPE well, results and evaluation of groundwater analytical data, DPE <br />remedial action (if conducted) and the SGI shall be submitted in a single report. The report <br />will include tabulated soil and groundwater data, an estimate of residual hydrocarbon mass, <br />updated cross-sections and an estimate of the time required for groundwater to attain water <br />quality objectives. <br />If you have any questions, please contact Horizon at (916) 939-2170. <br />Sincerely, <br />HORIZON ENVIRONMENTAL INC. <br />Gary D. Barker <br />Senior Project Manager <br />// 1�5� <br />Rexford K. Smith, P.G. No. 5307 <br />Project Manager <br />Enclosures <br />Figure 1: <br />Figure 2: <br />Figure 3: <br />Site Location Map <br />Site Map / Groundwater Elevation Contour Map <br />TPHg / Benzene / DCA Concentrations in Groundwater <br />Figure 4: Proposed Monitoring Well Location <br />Figure 5: Proposed Soil Gas Sample Locations <br />Horizon Environmental Inc. Field Methods and Procedures <br />Typical Well Construction Diagram <br />cc: Mr. Roger Levin, Ultramar, Inc. <br />Sayed and Zakia Abdetwahed <br />Mr. James L.L. Barton, Regional Water Quality Control Board <br />1792 DPE Well WP <br />Project No. 1792.26 8 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.