ENVIRONMENTAL HEALTH 15EPARTMENT
<br />SAN JOAQUIN COUNTY
<br />304 East Weber Avenue, Third Floor
<br />Stockton, California 95202-2708
<br />Telephone: (209) 468-3420
<br />Fax: (209) 464-0138
<br />Website: www.sjgov.org/ehd/
<br />LAURA ANDREW
<br />SARA LEE BAKING GROUP
<br />8400 MARYLAND AVE
<br />ST LOUIS MO 63105-3668
<br />RE: The Earthgrains Company Facilit
<br />2651 South Airport Way
<br />Stockton, California 95206
<br />Unit Supervisors
<br />Carl Bergman, R.E.H.S.
<br />Mike Huggins, R.E.H.S., R.D.I.
<br />Douglas W. Wilson, R.E.H.S.
<br />Margaret Lagorio, R.E.H.S.
<br />Robert McClellon, R.E.H.S.
<br />Jeff Carruesco, R.E.H.S.
<br />DEC 13 2005
<br />`
<br />Sara Lee Bakery Group, Inc.
<br />Attention: Don Helsel (209) 547-2202
<br />C' L
<br />Environmental Coordinator
<br />Donna K. Heran, R.E.H.S.
<br />1Director
<br />pbii%4�
<br />Stockton, CA 95206
<br />lAI
<br />Olsen, R.E.H.S.
<br />Program Manager
<br />Laurie A. Cotulla, R.E.H.S.
<br />Program Manager
<br />SAN JOAQUIN COUNTY
<br />304 East Weber Avenue, Third Floor
<br />Stockton, California 95202-2708
<br />Telephone: (209) 468-3420
<br />Fax: (209) 464-0138
<br />Website: www.sjgov.org/ehd/
<br />LAURA ANDREW
<br />SARA LEE BAKING GROUP
<br />8400 MARYLAND AVE
<br />ST LOUIS MO 63105-3668
<br />RE: The Earthgrains Company Facilit
<br />2651 South Airport Way
<br />Stockton, California 95206
<br />Unit Supervisors
<br />Carl Bergman, R.E.H.S.
<br />Mike Huggins, R.E.H.S., R.D.I.
<br />Douglas W. Wilson, R.E.H.S.
<br />Margaret Lagorio, R.E.H.S.
<br />Robert McClellon, R.E.H.S.
<br />Jeff Carruesco, R.E.H.S.
<br />DEC 13 2005
<br />`
<br />Sara Lee Bakery Group, Inc.
<br />Attention: Don Helsel (209) 547-2202
<br />C' L
<br />Environmental Coordinator
<br />2651 South Airport Way
<br />Stockton, CA 95206
<br />San Joaquin County Environmental Health Department (EHD) has reviewed the letter dated
<br />December 6, 2005, documenting discussions on November 10, 2005, between Sara Lee Bakery
<br />Group, Inc., represented by Philip Environmental Services Corporation (PSC) and ETIC
<br />Engineering (ETIC), and EHD. PSC's letter succinctly summarizes the main points presented at
<br />this meeting and requests changes for future groundwater sampling at this site.
<br />EHD concurs with recommendations to continue measuring depth -to -water and total depths for
<br />all wells on a quarterly basis to determine groundwater gradient; discontinue sampling monitoring
<br />wells MW -3 and MW -6 based on well locations and non -detect results reported historically for
<br />these wells; and annual collection in July of groundwater samples from MW -10.
<br />EHD recommends that you continue to build upon the site conceptual model submitted to EHD in
<br />April 2003; and revise the fate and transport model included in Quarterly Groundwater
<br />Monitoring Report, October 2004 dated August 19, 2005, with site specific data, where possible,
<br />and propose a method for testing this model.
<br />If you have any questions regarding this letter, please contact Vicki McCartney at (209) 468-3456
<br />or by electronic mail at vmccartney@sjcehd.com.
<br />Donna Heran, RENS, Director
<br />Environmental Health Department
<br />Victoria McCartney, Senior REHS
<br />7
<br />Unit IV -Site Mitigation
<br />c: Paul Anderson — PSC
<br />Thomas Neely, PG — ETIC
<br />James L.L. Barton, PG — CVRWQCB
<br />Nuel C. Henderson, Jr., PG
<br />Unit IV- Site Mitigation
<br />
|