Laserfiche WebLink
� —U <br />Mr. John DeSelm <br />-2- <br />4 April 1989 <br />4. The lithologic logs for all monitoring wells and borings at this site <br />are to be included in the PAR. <br />Upon completion of this proposed work, assuming that the ground water plume <br />has been adequately defined, a complete and comprehensive PAR is to be <br />completed and submitted to us and the SJLHD within six (6) weeks of receiving <br />the laboratory results, but no later than 15 June 1989. If the ground water <br />plume is not defined upon the completion of this work, additional <br />investigative work will be required and a work plan is to be completed and <br />submitted to,us and the SJLHD within three (3) weeks of receiving the~— <br />laboratory results. The results of the proposed work are to be included in <br />this work plan. <br />If you have any questions, please call me at (916) 361-5725. <br />6 w./,(1 <br />EDWARD W. -UMES <br />Engineering Geologist <br />EWJ:ewj <br />cc: JMs. Diane Hinson, San Joaquin Local Health District, Stockton <br />Mr. Frank McPherson, Rainbo Bakery, Stockton <br />Mr. John A. Baker, Anderson Geotechnical Consultants, Roseville <br />