PSC INDUSTRIAL OUTSOURCING, LP <br />210 West Sand Bank Road, Columbia, IL 62236 <br />(618)281-1543 Fax(618)281-7020 <br />L <br />Well Destruction Work Plan <br />t <br />• <br />Facility Site Code: 19093 <br />7 <br />L' <br />February 20, 2012 <br />Page 3 of 4 <br />VV <br />L <br />These wells include; W-1, MW -4, MW-!�MW-12, 12, MW- <br />of concern vy}}i th, be destroy. ThM <br />SP -1, SP-2,/SP-6, PZ -1, PZ -2, SP -A, and VW- 1!All drilling equipment will be decontaminated <br />before and between drilling and destruction of each impacted well. A summary of analytical data <br />for groundwater well samples is presented on Table 2. - <br />The wells will be destroyed by over-drilling the well boreholes to total depth and removing all or <br />as much as possible of the well casing. If retrieving the casing in -whole is not possible, over- <br />drilling to total depth with a larger drill bit may be necessary to destroy the well casing. Upon <br />completion of over drilling and casing removal, the SJCEHD grout inspector will be notified for <br />inspection and grouting approval. <br />Pressurized borehole grouting will be completed with a neat -cement grout mixture consisting of <br />approximately 5 -gallons water to each 94 -pound bag of Type II -IV Portland cement. Pressure <br />grouting will be completed by placing tremie rods into the borehole inside the hollow -stem <br />L. <br />augers. All pressure grouting will take place from total depth upwards. Once the boreholes have <br />be by feed. <br />I <br />been grouted to 30 feet below ground surface (bgs), the borehole may grouted gravity <br />no <br />PSC will attempt to minimize groundwater being displaced on the surface during pressure <br />W¢A� <br />grouting by pumping water rising inside the auger. Groundwater displaced to the surface during <br />I h r <br />grout installation will be pumped out and/or captured and containerized in Department of <br />` <br />Transportation (DOT) approved, 55 -gallon drums. Groundwater elevation data is presented on <br />Table 3. <br />Surface restoration will commence a minimum of 24 hours after completing the pressure borehole <br />grouting of the well boreholes. The surface restoration will then be completed using hot -mix <br />asphalt or concrete as appropriate. Any property or vegetation damage that inadvertently occurs <br />as part of the necessary field activities will be properly restored. PSC intends to use Osborne <br />�— <br />Concrete Coring and Stanley Engineering to complete the surface restoration activities. <br />In some unforeseen cases, wells may need to be pressure -grouted without casing removal due to <br />unsafe proximity to subsurface utilities. These instances would be discussed upon occurrence in <br />the field on a case-by-case basis with SJCEHD. According to San Joaquin County Well <br />Standards, in some circumstances, wells may be pressure grouted with the casing left in-place. If <br />the well is to be grouted in-place, the top 3 feet of the well casing shall be drilled out with an <br />` <br />auger that is one -foot larger in diameter than the auger utilized to install the well. Additional 6 - <br />inches of soil shall be removed from around the cutoff casing to expose it. The grout rods will be <br />placed to total depth within the well casing. Pressure grouting will continue until grout spills out <br />�- <br />of the cut casing and fills in the excavated 6 -inch void beneath the top of cut casing and up to a <br />minimum of 6 -inches above the cut casing. <br />The soil, water, and well debris (IDW) generated during the well destruction activities, will be <br />L. <br />stored in DOT approved 55 -gallon drums. The drums will be transported to a licensed waste <br />disposal facility for proper disposal. <br />L. <br />POST -FIELD ACTIVITIES <br />The post -field activities include completion of the California DWR Well Destruction Reports and <br />t.. <br />the SJCEHD Well Destruction Completion Report. PSC will notify the property owner, <br />PSC INDUSTRIAL OUTSOURCING, LP <br />210 West Sand Bank Road, Columbia, IL 62236 <br />(618)281-1543 Fax(618)281-7020 <br />L <br />