Laserfiche WebLink
SUMMARY AND RECOMMENDATIONS <br /> 1 <br /> Groundwater-monitoring has been conducted at this facility since 1987 to evaluate <br /> 1 groundwater quality A summary of the current site conditions and a <br /> recommendation for subsequent work are as follows <br /> ' • During this event, the average depth to groundwater among the wells was <br /> 47 60 feet bgs (-30 92 feet msl), which indicates an approximate 2 56 foot <br /> decrease in elevation from the previous event The groundwater flow was Z 2 <br /> generally easterly at a gradient of approximately 0 003 feet per linear foot A ' <br /> 0 The total well depth measurements indicated that an appreciable amfit of <br /> silt may have infiltrated wells MW-5, MW-7, SP-1, SP-5, and SP-6 Wells <br /> MW-5, MW-7, and SP-1 will be redeveloped, if possible, during the next <br /> quarterly event Wells SP-5 and SP-6 will no longer be sampled <br /> ' • BTEX and/or TPH-g were detected in the groundwater samples from wells <br /> MW-1, MW-5, MW-7, MW-11, SP-1, SP-2, SP-6, PZ-1, and PZ-2 <br /> ' • The current BTEX concentrations were evaluated against the California <br /> Drinking Water MCLS Based on the current groundwater monitoring data, <br /> the MCL for benzene was exceeded in wells MW-1, MW-7, MW-11, SP-1, <br /> PZ-1, and PZ-2 The MCL for toluene was exceeded in wells -1 and <br /> SP-1 The MCL for ethylbenzene was exceeded in wells MW-AanPZ-1 <br /> The MCL for xylenes was exceeded in wells MW-1 and SP-1 Vlp" <br /> ® The analytes TBA, DIPE, ETBE, and/or TAME were detected in wells <br /> MW-1, MW-5, MW-7, SP-1, and PZ-1 <br /> • The analyte 1,2-DCA was detected in wells MW-1, MW-5, MW-7, MW-8, <br /> MW-12, and SP-5 Based on the current groundwater monitoring data, the <br /> MCL for 1,2-DCA has been exceeded in wells MW-1, MW-5, MW-7, MW-8, <br /> MW-12, and SP-5 <br /> Based on the results of the November 2005 sampling event, it appears that further rtr+� <br /> groundwater remediation is warranted at the site PSC recommended that sampling-Q � <br /> from wells MW-3 and MW-6 be discontinued, wells MW-5, MW-7, and SP- be <br /> ' redeveloped, if possible, during the next quarterly event, and well MW-10 be sample G�so PZ- 2 <br /> on an annual basis (during the third quarter) SJCEHD agreed to the r L, <br /> recommendations in correspondence dated December 13, 2005 The SJCEHD also <br /> tapproved the discontinuation of sampling wells SP-3, SP-4, SP-5, and SP-6 during - <br /> the November 10, 2005 meeting SJCEHD also recommended that the April 2003 <br /> Site Conceptual Model be modified and the October 2004 Fate and Transport Models <br /> be revised The revisions will be submitted in subsequent quarterly reports <br /> 1 Quarterly Groundwater Monttorulg Report <br /> 4th Quarter-November 2005 <br /> Prepared for SARA LEE BAKERY GROUP,INC Prepared by PSC Environmental Services <br /> 1 Investrgarrve and Quarterly Report 14th Quarterly Report 11.2005 doe February 24,2006 <br />