Laserfiche WebLink
trench backfill or spread on site Well purge water will be temporarily <br /> stored on site in sealed drums pending proper disposal Condensate from <br /> the moisture separators will be allowed to evaporate since flow is expected <br /> to be less than one gallon per day Spent GAC will be taken off-site and <br /> 1 regenerated by the supplier <br /> 3.7 Permitting <br /> All necessary construction and air emissions permits will be obtained prior <br /> 1 to construction of the proposed system <br /> j <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Final Remediation Plan <br /> Prepared for PAINBO BAKING COMPANY 9 Prepared by Burlington Environmental Ino <br /> E 112138211259971TESTEVAL DOC 211195 <br />