My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
2900 - Site Mitigation Program
>
PR0529622
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:53:12 PM
Creation date
10/23/2018 2:20:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529622
PE
2960
FACILITY_ID
FA0019603
FACILITY_NAME
APPLIED AEROSPACE STRUCTURES CORP
STREET_NUMBER
3437
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17702033
CURRENT_STATUS
01
SITE_LOCATION
3437 AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Margaret Lagorio <br /> October 6, 1995 <br /> Page 3 <br /> The HASP will be available on site for review. <br /> Report of Findings <br /> Following completion of field activities, a brief written report of findings will be prepared. The <br /> report will present a summary of analytical data with a map of sample locations. In addition, soil <br /> boring logs will be provided. <br /> SCHEDULE <br /> The proposed field and mobile laboratory analyses can be completed within approximately three <br /> days following regulatory agency approval of this work plan. The scheduled start date for these <br /> activities is Tuesday, October 10, 1995. Any analysis conducted in a fixed laboratory will take <br /> up to two additional weeks depending on the turnaround time requested. The written report of <br /> findings will be submitted to the client within one week after receipt of laboratory, resulting in <br /> an overall three-week duration for the site investigation project. <br /> McLaren/Hart appreciates the opportunity to provide this workplan for your review and approval. <br /> Should you have any questions regarding these field activities please feel free to contact us at <br /> (916) 638-3696. <br /> Sincerely, <br /> McLaren/Hart Environmental Engi eering Corporation <br /> ��4Q <br /> Laura J. O e thal R.G. #6250 <br /> Senior Geoscientist <br /> Stephen Carlton, C.H.G. #198 <br /> Principal Geoscientist <br /> Attachments <br /> L\BP_AMER\RC951466.WP <br /> 10.06.95 QgRren° <br /> art <br /> ENVIRONMENTAL ENGINEERING CORPORATION <br /> .ended cew <br />
The URL can be used to link to this page
Your browser does not support the video tag.