Laserfiche WebLink
Ms. Margaret Lagorio <br /> October 6, 1995 <br /> Page 3 <br /> The HASP will be available on site for review. <br /> Report of Findings <br /> Following completion of field activities, a brief written report of findings will be prepared. The <br /> report will present a summary of analytical data with a map of sample locations. In addition, soil <br /> boring logs will be provided. <br /> SCHEDULE <br /> The proposed field and mobile laboratory analyses can be completed within approximately three <br /> days following regulatory agency approval of this work plan. The scheduled start date for these <br /> activities is Tuesday, October 10, 1995. Any analysis conducted in a fixed laboratory will take <br /> up to two additional weeks depending on the turnaround time requested. The written report of <br /> findings will be submitted to the client within one week after receipt of laboratory, resulting in <br /> an overall three-week duration for the site investigation project. <br /> McLaren/Hart appreciates the opportunity to provide this workplan for your review and approval. <br /> Should you have any questions regarding these field activities please feel free to contact us at <br /> (916) 638-3696. <br /> Sincerely, <br /> McLaren/Hart Environmental Engi eering Corporation <br /> ��4Q <br /> Laura J. O e thal R.G. #6250 <br /> Senior Geoscientist <br /> Stephen Carlton, C.H.G. #198 <br /> Principal Geoscientist <br /> Attachments <br /> L\BP_AMER\RC951466.WP <br /> 10.06.95 QgRren° <br /> art <br /> ENVIRONMENTAL ENGINEERING CORPORATION <br /> .ended cew <br />