My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8010
>
2900 - Site Mitigation Program
>
PR0526994
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 2:39:18 PM
Creation date
10/24/2018 11:49:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526994
PE
2957
FACILITY_ID
FA0018291
FACILITY_NAME
FMS #24 (OMS)
STREET_NUMBER
8010
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726029
CURRENT_STATUS
01
SITE_LOCATION
8010 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APP <br />Well Installation and Sampling at California National Guard Field Maintenance Shop <br />Stockton, California • <br />4.0 RESPONSIBILITIES AND LINES OF AUTHORITIES <br />OTIE has the ultimate responsibility for implementation of this APP/SSHP and the safety <br />program (as per 4a, EM 385-1-1). No work shall be performed unless a designated competent <br />person is present on the job site (as per 4d, EM 385-1-1). <br />Our Corporate requirements for pre -task safety and health analysis (as per 4e) include <br />conducting a thorough analysis for all definable features of work and their individual hazards <br />and controls. This analysis is found in the AHAs for each project site. <br />Disciplinary actions for violation of safety requirements (as per 4g) include the following: <br />• For a safety violation that does not result in an injury or illness, the first warning is a <br />verbal warning, followed by a written warning (see Safety Violation Form in Appendix C). <br />A subsequent violation results in removal of the person from the job site. <br />• If the safety violation is serious, the person(s) may be immediately removed from the job <br />site. <br />Also refer to Section 5.1 for violations from subcontractors and suppliers. <br />Refer to Section 3. 1, OTIE Corporate Safety Policy, describing policy for holding managers and <br />supervisors accountable for safety (as per 4h). Daily safety inspections will assist in enforcing <br />supervisor accountability. • <br />Lines of authority information in this section is also located in the SSHP (Appendix 1), and in <br />Section 2.0 "Key Personnel and Responsibilities. To meet the OTIE goal of Zero Incidents and <br />Safety Excellence and to ensure that the work is conducted in a safe and healthful manner, the <br />Project Team has developed a line of reporting and has tasked individuals with the following <br />safety and health responsibilities. The resumes in Appendix D are for the following safety and <br />competent personnel: <br />• Mr. William S. Fink, OTIE SHM <br />• Mr. Lik-See Chung, Project SSHO <br />4.1 PROJECT MANAGER <br />The PM, Mr. Michael Quillin, will be the direct point of contact for the issues relating directly to <br />the management aspects of the project. He will function as the immediate supervisor of the <br />SSHO. He will administer the subcontracts required for the successful completion of the project <br />and will be responsible for invoicing and other administrative functions directly related to the <br />project. <br />4.2 FIELD TEAM LEADER <br />Mr. James Medley is the Field Team Leader (FTL) for this project. He will ensure that site <br />personnel have read, signed, and will follow the master copy of this document. He will <br />coordinate with the SSHO on accident investigations, as necessary and investigate and report <br />to the PM and SSHO each work-related illness or injury, near misses, accidents, or damage to <br />physical property. • <br />OTIE <br />
The URL can be used to link to this page
Your browser does not support the video tag.