My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8020
>
2900 - Site Mitigation Program
>
PR0538970
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 3:20:46 PM
Creation date
10/24/2018 1:13:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538970
PE
2953
FACILITY_ID
FA0022382
FACILITY_NAME
STOCKTON CSMS
STREET_NUMBER
8020
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
8020 S AIRPORT WAY
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> ATTACHMENT 1:REVISED TECHNICAL PROPOSAL 27 May 2014 <br /> sealed. Staged drums will be labeled, as "Non-Hazardous Waste - Analysis <br /> Pending" until sample results are received. Soil disposal characterization <br /> sampling will be provided as detailed in the following bullet item. <br /> • Obtain one composite soil sample from the drums and send it to a California- <br /> certified laboratory for the analyses to support waste characterization. ECM has <br /> priced these analyses for a 5 day turnaround: <br /> o TPH-Jet (EPA 8015), <br /> o Cam 17 Metals, and <br /> o SVOC (EPA 8270). <br /> Additional analyses may be required if total constituent concentrations exceed <br /> the soluble threshold limit concentrations by tenfold or more. ECM's laboratory <br /> will extract two samples using the WET method and analyze each for up to five <br /> additional metals, as necessary. <br /> • Procure and deliver up to two cubic yards of soil backfill material to fill in and <br /> restore the excavated area to grade. ECM will compact the backfill soil by wheel <br /> rolling with the backhoe and has not included costs for compaction testing. <br /> • Delineate the open excavation with safety fence and/or drums while waiting for <br /> excavation confirmation soil sample results. <br /> • Obtain two (2) bottom-of-excavation soil samples to confirm the vertical extent of <br /> the excavation and confirm that all contaminated soil has been removed. <br /> ECM will use the PID to field screen soils once excavation extents are identified <br /> with the inspector. Field screening will be performed by obtaining a small soil <br /> sample from the excavation bottom and placing the sample in a plastic bag. The <br /> sample will be given 10 minutes of wait time and then the PID will be inserted <br /> into the bag to read the VOC concentration in the head space vapors. If field <br /> screen results are above 100 parts per million by volume (ppmv), another 6" soil <br /> will be excavated, and then samples will be collected and field screened. Once <br /> PID field screening yields results below 100 ppmv, soil confirmation samples will <br /> be collected from the bottom of the excavation. If field screening results do not <br /> yield 100 ppmv after excavating an additional 6", work will be stopped and the <br /> CA ARNG will be notified. <br /> Samples will be sent to a CA certified laboratory for the following analysis on a <br /> 24hr turnaround time (TAT) for: <br /> • TPH-Jet (EPA 8015) and <br /> ■ SVOCs (EPA 8270). <br /> • ECM will standby for 1 day while the soil confirmation sampling from the bottom <br /> of the excavation results are analyzed and reported. ECM will return to the site <br /> for 1 day to backfill the excavation and restore the site to pre-excavation <br /> conditions. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.