Laserfiche WebLink
0 0 <br /> ATTACHMENT 1�REVISED TECHNICAL PROPOSAL 27 May 2014 <br /> • Prepare a brief report for CA ARNG summarizing the clean-up activities, to serve <br /> as a record of the fuel spill clean-up. ECM has included time for 1 round of <br /> comments from the CA ARNG. <br /> • ECM will produce and distribute copies of the draft report electronically. <br /> • ECM will produce and distribute 2 hard copies of the final report. <br /> III. ASSUMPTIONS <br /> 1. ECM assumes that site access will be granted and the site will be fully accessible. <br /> 2. ECM assumes that excavation, sampling and backfill can be accomplished in one <br /> (1) mobilization over three (3) days with one (1) day of standby time. <br /> 3. ECM assumes that the backhoe can be staged onsite while waiting excavation <br /> confirmation soil sampling results to be received. <br /> 4. ECM assumes that the excavation bottom sampling results will be acceptable and <br /> excavation can be backfilled. Additional excavation and sampling has not been <br /> included this proposal. <br /> Page 1 3 <br />