Laserfiche WebLink
From: LARRY SHEPHERD To: Steve sesson Date: 8130/99 Time: 8:17:04 AM Page 11 of 25 <br />Ambulance Call 911 National Response center (800) 424_8842 <br />13,0 Certified Industrial Hygienist <br />A CIH is not necessary for this portion Of the project. There <br />will be no tank entry. <br />1.3.1 Gas Station Operations <br />All gas sells will halt during the removal and replacment process. <br />%ce the tanks have been installed and meet all local and federal codes the <br />station may proceed with normal sells. <br />14.0 Professional Engineer <br />Joe €'lecnik has been the consultant and Ply for this project. Joe gives <br />advise where is needed and will be available for comment on this and other <br />sections of this prgiect. <br />I.5.0 Tank Warranty <br />Containment Solutions will be on site during this project. To assure <br />that the install of the tanks meet all requirements to uphold the integrity for <br />the warranty of the tanks. The factory reps will also be submitting reports <br />that will confirm the integrity of the tank for the warranty puposes. <br />