Laserfiche WebLink
From: LARRY SHEPHERD To: Steve sasson Date: 8130199 Time: 8:17:D4 AM Page 12 of 25 <br />1 6.0 Tank venting <br />The vapor lines to the tanks will be disconnected and venting <br />during the removal and replaccmeat of the tanks. To assure that the work <br />area is free of volatile vapors during the process of R/R of the tanks. The <br />tanks have been triple- washed and dry iced.17he application for the dry ice <br />was 30lbs of tee to every 1000 gallons of storage. <br />17. 0 Re -testing <br />Once the tanks have been installed and all the vapor lines re- <br />installed the proper testing will he done. The test w-0 be conducted by San <br />Joaquin Valley APCD prior to calling for final i <br />permit_ nspection of operating <br />18.0 Field Changes <br />All changes to the work plan in the field must be submitted to <br />PHSfFI-fD for approval before work may continue. <br />