My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'A <br />I WeiRkWIbil ANI <br />Date: June 28, 1999 <br />To: Robert Sliger, D and S Dragline 209 826 8699 <br />Cc: Larry Sheppard, CL Bryant 209 556-5036 <br />RE: Tank 508404 and Tank 508405 <br />Tracy Get and Go <br />574 W Grant Line Road <br />Tracy CA <br />I received a work plan from Larry Sheppard at 11:30 on June 28, 1999. I have performed a <br />preliminary review of your site safety plan which includes a section entitled "scope of <br />operations". In summary you have proposed that you will replace the 15,000 gallon UST <br />with an identical UST. You have also propsed that the 10,000 gallon UST which is currently <br />out of round will be relieved of back fill pressure and measured for roundness. If it returns <br />to round (i.e. repaired) it will be returned to the excavation. If it the deflection remains <br />greater than that which is accepted by the factory then a new UST will be installed. <br />Please be aware that PHS/EHD policy 94-009 states that maximum time for a preliminary <br />review is 20 working days and maximum time for a full review is 40 working days. This <br />preliminary review is not to be considered by you as complete review. Under the conditions <br />of the repair permit section 5 you must "Attach detailed information as to methods used to <br />line/repair the tank... " The detailed information or repair work plan must be signed and <br />submitted by the licensed contractor. Submittals from non -licensed sub contractors will not <br />be approved by PHS/EHD. <br />The following is a list of issues that are not addressed in "Section 3.0 Scope of Operations" <br />contained in your site safety plan. These issues need to be addressed and the work plan <br />approved prior to scheduling any appointments at the site: <br />1) All removed UST's shall be transported to a licensed treatment or disposal facility. <br />Please specify the destination of the UST's. The treatment or disposal facility must <br />submit a manifest to PHS/EHD stating that it received the UST. <br />2) The method used to inert the tanks is not specified in the work plan. <br />3) Please submit the DTSC Tank Closure Certification Form to the inspector on site <br />prior to removal of either UST. <br />4) A removal permit or approval for the removal from Tracy Fire Department must be <br />provided with the work plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.