My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Date: June 23, 1999 <br />To: Robert Sliger, D and S Dragline <br />From: Steven Sasson, PHS/EHD SY <br />RE: Tracy Get and Go <br />574 W Grantline Rd., Tracy <br />It is my understanding from contact with Larry Sheppard of Cl Bryant that you intend to <br />repair the damaged UST at this site. Subsequent contacts with individuals from Cl Bryant <br />indicate that replacement of both fiberglass UST's with steel UST's is an option that you are <br />considering. <br />As you recall, condition 10 of the repair permit issued June 15, 1999 states "The special <br />inspector will provide written repair plans... prior to any repair... " At the present time the <br />special inspector has not submitted this plan. Furthermore until a repair plan has been <br />approved by this agency no repair of the UST is authorized. Please note that if the tank is to <br />be removed under this plan, PHS/EHD must be on site for the removal inspection. <br />If you decide to replace the existing UST's with new UST's you will need to submit a <br />completed Application for Underground Storage Tank Installation Permit for the new UST <br />installation. I have enclosed a copy of the PHS/EHD Policy 94-009 "Maximum Review <br />Time Policy for New UST Installation Plans" for your convenience. <br />In either case, permits and work plans must be approved prior to scheduling inspections. <br />Please note this agency requires a minimum 48-hour advance notice of all inspections. <br />Finally, all contact regarding permit issues at this site shall be between the California State <br />Licensed Contractor to which PHS/EHD has issued the permit, and PHS/EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.