Laserfiche WebLink
PUBLIC HEALTH SERVICES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DMSION y. <br />Karen Furst, M.D., M.P.H., Health Officer. P <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/468-3420 <br />TO: CONTRACTORS AND OWNERS PROPOSING TO INTERIOR LINE, REPAIR, <br />OR UPGRADE UNDERGROUND STORAGE TANKS (UST's). <br />San Joaquin County Public Health Services -Environmental Health Division (PHS-EHD) has established the <br />following guidelines to assist you in the completion of your tank lining, repair, or upgrade project. <br />SUBMITTAL OF PLANS <br />a. Submit 3 completed copies of the permit application along with a "PHS-EHD Service <br />Request" form to the above letterhead address. <br />b. A permit will be issued by PHS-EHD upon review and approval of the application and plans. <br />The required fees must be submitted with the application package. Information in addition to <br />that presented in the application may be needed to obtain final approval. No work is to begin <br />on the proposed project until a permit has been issued. The required inspections cannot be <br />scheduled until a permit is issued. <br />c. Prior to tank lining, a site assessment must be performed under the direction of PHS-EHD, <br />Site Mitigation Unit. Please contact the Site Mitigation Unit at (209) 468-3450 for further <br />information regarding the assessment. <br />d. To comply with the 1998 upgrade requirements in conjunction with the tank lining, then <br />equipment and material specification sheets and manufacturer's brochures must be <br />submitted for all proposed equipment. All proposed leak detection methods and equipment <br />must meet the requirements specified in 40 CFR 280.40 and have been reviewed by the <br />State Water Resources Control Board. If the UST facility does not meet the upgrade <br />requirements by December 22, 1998, then the tank(s) must be closed according to Article 7, <br />California Code of Regulation (CCR). <br />e. After permit approval, it is the responsibility of the applicant to notify PHS-EHD at least 48 <br />hours in advance to schedule the required inspections. <br />f. Permit from local fire authority must be provided prior to any work. <br />g. A Certified industrial hygienist must be on site during any tank entries and provide safety <br />management for the site. <br />h. Tank lining cannot void the UL label for the tank. UFC Section 5202.3 <br />i. Tank liner must be able to provide new UL label for each tank upon completion of lining <br />process. UFC Section 5202.2.3 <br />j. A complete site safety plan must be provided for work at the site. The PHS-EHD does not <br />take responsibility for review of this plan and is the responsibility of the contractor for the <br />completeness and meeting all Federal, State and Local code requirements. <br />k. The special inspector must personally make all required inspections and measurements. <br />All inspections by the special inspector must be witness by the PHS-EHD and final <br />approval for the tank condition and suitability for the lining of the tank will be with the PHS- <br />EHD. <br />A Division of San Joaquin County Health Care Services <br />