My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. PLAN REVIEW AND PERMIT FEES <br />a. UST lining or repair plan review fee is $234.00 per tank. Upgrade plan review fee is $234 <br />per facility. Additional time spent on plan review, meetings, inspections, phone or office <br />consultations will be billed to the applicant at a rate of $78.00 per hour. <br />b. The maximum review time for UST interior lining or repair plans is 40 working days. A <br />preliminary review will be conducted by PHS-EHD within 20 working days of submittal. <br />C. If gross deficiencies are identified, the plan will be returned with a checklist identifying <br />plan deficiencies. <br />3. PLAN REVIEW GUIDELINES <br />a. The attached plan review sheet is to be completed and submitted to PHS-EHD. <br />b. Permits and/or plan check approval may also be required by the San Joaquin Valley <br />Unified Air Pollution Control District, the County/City Building Department and the Fire <br />District in your respective area. <br />C. Applicant/contractor to adhere to the approved plan and any change or deviation shall be <br />reported to and approved by PHS-EHD prior to installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.