My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AURORA
>
1000
>
2200 - Hazardous Waste Program
>
PR0514266
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 9:40:54 AM
Creation date
10/31/2018 9:20:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514266
PE
2220
FACILITY_ID
FA0010274
FACILITY_NAME
SIMS METAL
STREET_NUMBER
1000
Direction
S
STREET_NAME
AURORA
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1620
APN
15132022
CURRENT_STATUS
01
SITE_LOCATION
1000 S AURORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AURORA\1000\PR0514266\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
8/21/2017 10:44:31 PM
QuestysRecordID
3598839
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Emergency Response <br />Sims Metal Management June 2010 <br />Emergency Response Plan <br />1.0 Purpose <br />The purpose of this Emergency and Contingency Plan is to provide guidance in the <br />event of an emergency. The Sims Metal Management NW "Emergency Coordinator" will <br />be the crew leader (SHEC Coordinator, Facility Manager) on site when the incident <br />occurs. Sims Metal Management NW's Emergency Response Plan is designed to give <br />general guidelines and these guidelines should only be deviated from if following the <br />letter of the plan would cause further harm or injury to Sims Metal Management NW <br />personnel, client personnel, or any member of the general public. If any local, state, or <br />federal agencies' guidelines or laws contradict this plan, that agency's guidelines or said <br />laws should be adhered to. <br />2.0 Table of Contents <br />1.0 Purpose <br />2.0 Table of Contents <br />3.0 Responsibility and Authority <br />4.0 Prior to Project Initiation <br />5.0 Hazardous Materials / Waste Release <br />6.0 Fire <br />7.0 Explosion <br />8.0 Accidents <br />9.0 Chemical Exposure <br />10.0 Equipment Damage / Failure <br />11.0 Natural Disasters <br />12.0 Bomb Threats 1 Domestic Terrorism <br />13.0 Notification of Authorities <br />14.0 Emergency Equipment <br />15.0 Emergency Evacuation Procedure <br />Appendix A — Incident Communication Plan <br />Appendix B - Emergency Notifications <br />Appendix C - Evacuation 'Plans <br />Appendix D - Employee Training <br />3.0 Responsibility and Authority <br />Sims Metal Management NW's responsibility is to the safety and protection of the <br />employee, clients and general public. <br />3.1 Sims Metal Management NW has a designated representative, "Emergency <br />Coordinator", who assumes the lead on an emergency response. <br />4.0 Prior to Project Initiation <br />It is the responsibility of the crew leader on any given job to ensure that all necessary <br />equipment for emergency operation necessary to a specific project is on hand or <br />immediately available. Further, it is the crew leader's responsibility to learn what local <br />and state agencies having jurisdiction are to be contacted in the event of an emergency <br />
The URL can be used to link to this page
Your browser does not support the video tag.