Laserfiche WebLink
Environmental Protection Agency § 112.4 <br /> (e) If you are the owner or operator cific aspects of the Plan, such exten- <br /> of a facility for which a Plan is re- sion does not affect your obligation to <br /> quired under this section,you must: comply with the requirements related <br /> (1) Maintain a complete copy of the to other equipment or other specific as- <br /> Plan at the facility if the facility is pects of the Plan for which the Re- <br /> normally attended at least four hours gional Administrator has not expressly <br /> per day, or at the nearest field office if authorized an extension. <br /> the facility is not so attended, and <br /> (2) Have the Plan available to the Re- 167 FR 47140, July 17, 2002, as amended . 68 <br /> , <br /> gional Administrator for on-site review FR 1351, Jan. 9, 2003; 68 FR 18894, Apr. 17, <br /> 2003;69 FR 48798,Aug. 11,20041 <br /> during normal working hours. <br /> (f) Extension of time. (1) The Regional §112.4 Amendment of Spill Preven- <br /> Administrator may authorize an exten- tion, Control, and Countermeasure <br /> sion of time for the preparation and Plan by Regional Administrator. <br /> full implementation of a Plan, or any If you are the owner or operator of a <br /> amendment thereto, beyond the time facility subject to this part, you must: <br /> permitted for the preparation, imple- (a) Notwithstanding compliance with <br /> mentation, or amendment of a Plan §112.3, whenever your facility has dis- <br /> under this part, when he finds that the charged more than 1,000 U.S. gallons of <br /> owner or operator of a facility subject oil in a single discharge as described in <br /> to this section, cannot fully comply §112.1(b), or discharged more than 42 <br /> with the requirements as a result of ei- U.S. gallons of oil in each of two dis- <br /> ther nonavailability of qualified per- charges as described in§112.1(b), occur- <br /> sonnel, or delays in construction or ring within any twelve month period, <br /> equipment delivery beyond the control submit the following information to <br /> and without the fault of such owner or the Regional Administrator within 60 <br /> operator or his agents or employees. days from the time the facility be- <br /> (2) If you are an owner or operator comes subject to this section: <br /> seeking an extension of time under <br /> paragraph (f)(1) of this section, you (1) Name of the facility; <br /> may submit a written extension re- (2) four name; <br /> quest to the Regional Administrator. (3) Location of the facility; <br /> Your request must include: (4) Maximum storage or handling ca- <br /> (i) A full explanation of the cause for pacity of the facility and normal daily <br /> any such delay and the specific aspects throughput; <br /> of the Plan affected by the delay; (5) Corrective action and counter- <br /> (ii) A full discussion of actions being measures you have taken, including a <br /> taken or contemplated to minimize or description of equipment repairs and <br /> mitigate such delay; and replacements; <br /> (iii) A proposed time schedule for the (6) An adequate description of the fa- <br /> implementation of any corrective ac- cility, including maps, flow diagrams, <br /> tions being taken or contemplated, in- and topographical maps, as necessary; <br /> cluding interim dates for completion of (7) The cause of such discharge as de- <br /> tests or studies, installation and oper- scribed in §112.1(b), including a failure <br /> ation of any necessary equipment, or analysis of the system or subsystem in <br /> other preventive measures. In addition which the failure occurred; <br /> you may present additional oral or (8) Additional preventive measures <br /> written statements in support of your you have taken or contemplated to <br /> extension request. minimize the possibility of recurrence; <br /> (3) The submission of a written ex- and <br /> tension request under paragraph (f)(2) (9) Such other information as the Re- <br /> of this section does not relieve you of gional Administrator may reasonably <br /> your obligation to comply with the re- require pertinent to the Plan or dis- <br /> quirements of this part. The Regional charge. <br /> Administrator may request a copy of (b) Take no action under this section <br /> your Plan to evaluate the extension re- until it applies to your facility. This <br /> quest. When the Regional Adminis- section does not apply until the expira- <br /> trator authorizes an extension of time tion of the time permitted for the ini- <br /> for particular equipment or other spe- tial preparation and implementation of <br /> 27 <br />