Laserfiche WebLink
§112.5 40 CFR Ch. 1 (7-1-05 Edition) <br /> the Plan under§112.3, but not including (f) If you appeal a decision made by <br /> any amendments to the Plan. the Regional Administrator requiring <br /> (c) Send to the appropriate agency or an amendment to an SPCC Plan, send <br /> agencies in charge of oil pollution con- the appeal to the EPA Administrator <br /> trol activities in the State in which the in writing within 30 days of receipt of <br /> facility is located a complete copy of the notice from the Regional Adminis- <br /> all information you provided to the Re- trator requiring the amendment under <br /> gional Administrator under paragraph paragraph (e) of this section. You must <br /> (a) of this section. Upon receipt of the send a complete copy of the appeal to <br /> information such State agency or agen- the Regional Administrator at the <br /> cies may conduct a review and make time you make the appeal. The appeal <br /> recommendations to the Regional Ad- must contain a clear and concise state- <br /> ministrator as to further procedures, ment of the issues and points of fact in <br /> methods, equipment, and other require- the case. It may also contain addi- <br /> ments necessary to prevent and to con- tional information from you, or from <br /> tain discharges from your facility. any other person. The EPA Adminis- <br /> (d) Amend your Plan, if after review trator may request additional informa- <br /> by the Regional Administrator of the tion from you, or from any other per- <br /> information you submit under para- son. The EPA Administrator must <br /> graph (a) of this section, or submission render a decision within 60 days of re- <br /> of information to EPA by the State ceiving the appeal and must notify you <br /> agency under paragraph (c) of this sec- of his decision. <br /> tion, or after on-site review of your <br /> Plan, the Regional Administrator re- §112.5 Amendment of Spill Preven- <br /> quires that you do so. The Regional tion, Control, and Countermeasure <br /> Administrator may require you to plan by owners or operators. <br /> amend your Plan if he finds that it If you are the owner or operator of a <br /> does not meet the requirements of this facility subject to this part, you must: <br /> part or that amendment is necessary to (a) Amend the SPCC Plan for your fa- <br /> prevent and contain discharges from cility in accordance with the general <br /> your facility. requirements in §112.7, and with any <br /> (e) Act in accordance with this para- specific section of this part applicable <br /> graph when the Regional Adminis- to your facility, when there is a change <br /> trator proposes by certified mail or by in the facility design, construction, op- <br /> personal delivery that you amend your eration, or maintenance that materi- <br /> SPCC Plan. If the owner or operator is ally affects its potential for a dis- <br /> a corporation, he must also notify by charge as described in §112.1(b). Exam- <br /> mail the registered agent of such cor- ples of changes that may require <br /> poration, if any and if known, in the amendment of the Plan include, but <br /> State in which the facility is located. are not limited to: commissioning or <br /> The Regional Administrator must decommissioning containers: replace- <br /> specify the terms of such proposed ment, reconstruction, or movement of <br /> amendment. Within 30 days from re- containers; reconstruction, replace- <br /> ceipt of such notice, you may submit ment, or installation of piping systems; <br /> written information, views, and argu- construction or demolition that might <br /> ments on the proposed amendment. alter secondary containment struc- <br /> After considering all relevant material tures; changes of product or service; or <br /> presented, the Regional Administrator revision of standard operation or main- <br /> must either notify you of any amend- tenance procedures at a facility. An <br /> ment required or rescind the notice. amendment made under this section <br /> You must amend your Plan as required must be prepared within six months, <br /> within 30 days after such notice, unless and implemented as soon as possible, <br /> the Regional Administrator, for good but not later than six months following <br /> cause, specifies another effective date. preparation of the amendment. <br /> You must implement the amended Plan (b) Notwithstanding compliance with <br /> as soon as possible, but not later than paragraph (a) of this section, complete <br /> six months after you amend your Plan, a review and evaluation of the SPCC <br /> unless the Regional Administrator Plan at least once every five years <br /> specifies another date. from the date your facility becomes <br /> 28 <br />